©2016 Johnson Controls | The performance specifications are nominal and conform to acceptable industry standards. For applications at conditions beyond these specifications, consult the local
Johnson Controls office. Johnson Controls, Inc. shall not be liable for damages resulting from misapplication or misuse of its products.
© 2016 AirFixture, LLC
1
FlexSys
Control Box
CB2
Model:
Installation / Operation Manual
V160811
TOOLS REQUIRED:
1.
Power Screwdriver
• Phillips #3 Bit - floor panel screws
2.
Panel Lifter (Suction Cups) - remove
floor panels
3.
Voltmeter - confirm power status
MATERIALS REQUIRED:
1.
CB2 Control Box
2.
Plug & Play Cables (PAP-1J)
PREPARATION:
1.
Verify that the CB2 is the correct model, unit count and
location(s) per scheduled placement.
2.
Remove the floor covering / floor panel at the desired
location(s) (if installed).
3.
Verify that all adjacent floor panels are properly installed.
INSTALLATION:
Connect CB2 to designated thermostatic zone:
• Thermostat terminal connects to PAP-7B with the
included PAP-1J cable
• Air Valve terminal connects to the MIT3 air valves on
the trough with a PAP-1 cable
• Water valve connections are made to terminal blocks
inside the CB2 box
Refer to job-specific Zone Cabling Diagrams for details.
OPERATION:
Refer to Sequence of Operation on Page 2.
MAINTENANCE:
Once installed, the CB2 requires no regular service
or maintenance for proper operation.
IN
OUT
IN
OUT
IN
OUT
IN
OUT
T-STAT
A/V
CB
T
PAP-7B (WHITE)
LINE VOLTAGE
PM
PAP-1J (BLUE)
PAP-1 (BLUE)
CLWMIT
PAP-1J (BLUE)
PAP-1 (BLUE)
PAP-5 (GREEN)
CLWMIT
PAP-1J (BLUE)
WATER
VALVE
EXAMPLE ZONE:
T =
Thermostat
CB =
CB2 Control Box
CLWMIT =
Hydronic Linear Terminal with Air Valve Generation 3
PM =
Power Module