TOOLS REQUIRED:
   1.

 Power Screwdriver 

       • Phillips #3 Bit - floor panel screws

   

2.

 Panel Lifter (Suction Cups) - remove 

       floor panels

   3.

 Voltmeter - confirm power status

MATERIALS REQUIRED:

   

1.

 CB2 Control Box

   

2.

 Plug & Play Cables (PAP-1J)

   

PREPARATION:

   

1.

 Verify that the CB2 is the correct model, unit count and

       location(s) per scheduled placement.

   

2.

 Remove the floor covering / floor panel at the desired 

       location(s) (if installed).

   

3.

 Verify that all adjacent floor panels are properly installed.

INSTALLATION:

   Connect CB2 to designated thermostatic zone:

    •  Thermostat terminal connects to PAP-7B with the 

       included PAP-1J cable

    •  Air Valve terminal connects to the MIT3 air valves on 

       the trough with a PAP-1 cable

    •  Water valve connections are made to terminal blocks  

       inside the CB2 box

    Refer to job-specific Zone Cabling Diagrams for details.

OPERATION:

   Refer to Sequence of Operation on Page 2.

MAINTENANCE:

   Once installed, the CB2 requires no regular service 

   or maintenance for proper operation.

IN

OUT

IN

OUT

IN

OUT

IN

OUT

T-STAT

A/V

CB

T

PAP-7B (WHITE)

LINE VOLTAGE

PM

PAP-1J (BLUE)

PAP-1 (BLUE)

CLWMIT

PAP-1J (BLUE)

PAP-1 (BLUE)

PAP-5 (GREEN)

CLWMIT

PAP-1J (BLUE)

WATER

VALVE

EXAMPLE ZONE:

T =

 Thermostat

CB =

 CB2 Control Box

CLWMIT =

 Hydronic Linear Terminal with Air Valve Generation 3

PM =

 Power Module

Отзывы: