3. FOR THE USER

3.1

Commisioning

Warning

Installing and commissioning of this wa-
ter heater should only be carried out by
a qualified competent heating engineer.

Filling the water heater

1. Close the drain tap;
2. Open the cold water tap to the water

heater and open all taps where hot
water can be drained for de
aeration. The water heater is filled
as soon as cold water flows from all
taps;

3. Close all hot water taps.

Putting into operation

1. Check to see if the heater is filled

with water by running a little to
waste from a hot water tap
connected to the heater;

2. Check wether the ON/OFF switch is

in OFF-position;

3. Ensure gas supply is fully purged of

air and turn on gas cock;

4. Ensure that power has been

correctly supplied to the unit. Use a
voltage tester to check that the live is
to “L” and neutral to “N”. (Flame
detection is phase sensitive);

5. When first starting, the controller can

be in the lock out condition: depress
the reset button to free the control.
(After manual reset, an extended
prepurge/waiting time will occur);

6. Switch the ON/OFF switch into ON

position. If the pilot fails to ignite
within 25 seconds the controls will
go to lock out and the reset button
will need to be reset (wait 15
seconds before attempting reset). It
may be necessary to repeat the
lighting sequence a number of times
on the initial light up if all the air has
not been purged from the gas
supply;

7. The main burner pressure has been

factory set but should be checked
once normal operation is established
(see ‘Ratings’ for settings);

8. Set the temperature regulator to the

required setting (see ‘De-
scalcification’).

3.2

Use

The appliance is under water supply
pressure (maximum 8 bar). The amount
of cold water that is added is equal to
the amount of hot water used. The gas
control block automatically regulates the
gas supply. The main burner will ignite
as soon as a reduction in water
temperature is sended by the
thermostat. The main burner will shut
down as soon as the preset
temperature is achieved.

At high water temperatures there is
more scale buildup in the appliance. It is
for this reason that it is recommended
to place the temperature control knob in
position of 60 °C as the accumulation of
scale will be reduced.

Содержание SCE 100-95 G

Страница 1: ...MODEL SCE 75 75 G SCE 100 95 G HOTWATERSTORAGEHEATERS UNITED KINGDOM IRELAND Installation Commissioning and Maintenance Instructions...

Страница 2: ...ly harm Installation and commisioning should be carried out by a qualified competent installer The type of gas and the value at which the appliance is set standard in the factory are registered on the...

Страница 3: ...e system 15 2 1 5 Flue down draught safety device 15 2 1 6 Electrical connection 15 2 2 Commissioning 16 2 3 Removing and replacing the control panel front cover 17 2 4 Setting the gas pressure 17 2 5...

Страница 4: ...d in a steel jacket reduces unnecessary heat loss When the appliance is filled with water it continuously is under water pressure As hot water is drained from the tank cold water is added immediately...

Страница 5: ...ver 9 Intermittent pilot burner and flame probe Figure 1 Cross section of the heater 10 Cold water inlet 11 Combustion products dicharge safety device 12 T P valve connection 13 Outer casting 14 Flue...

Страница 6: ...that the burner ignites as soon as there is a demand for heat 1 2 2 Controlpanel Temperature control for the water heater is housed in the control column See figure 2 For safety purposes heaters are...

Страница 7: ...button on the control panel The unit has to be manually reset by pushing the reset button If the flame is lost during normal run the automatic ignition controller repeats the start sequence 1 2 4 Com...

Страница 8: ...dimension G All dimensions are given in mm roun ded off on 5mm See drawing 3 Dimensions SCE 75 75 SCE 100 95 A 1585 1780 B 1450 1640 D 645 675 E 770 775 G 130 130 K 340 340 M 1505 1685 N 1505 1685 R...

Страница 9: ...9 Figure 3 Dimensions...

Страница 10: ...9 Diameter main orifice mm 2 30 2 35 Diameter pilot orifice mm 0 23 0 23 DATA PROPANE G31 37 mbar Nominal heat input upper valvue kW 24 6 26 1 Nominal output kW 19 2 20 4 Inlet pressure mbar 37 37 Ga...

Страница 11: ...out 1 2 to 1 3 micro Amperes DC when only the pilot flame is burning Adjust the main burner pressure to zero to be able to measure under this condition With pilot and main burner in operation the ioni...

Страница 12: ...Installation should be carried out in accordance with all local authority and Building Regualions Model Water Bylaws bylaws of the local water supplier Building Standards Scotland Consolidation Regula...

Страница 13: ...the system complies with the requirements of the water by laws and appropriate building regulations When fitting it is essential the rules of good practice are applied at all stages of installation V...

Страница 14: ...ing regulations should be used Installation should be carried out generally as shown on the following diagram 1 Manual gas valve 2 Stop valve 3 Expansion vessel 4 T P safety valve 5 Non return valve 6...

Страница 15: ...arately in the delivery crate MUST be fitted to the top of the heater in an unmodified condition before connecting the flue system The sensor of the combustion products discharge safety device is pre...

Страница 16: ...ontroller can be in the lock out condition depress the reset button to free the control After manual reset an extended prepurge waiting time will occur 6 Switch the ON OFF switch into ON position If t...

Страница 17: ...of the column 2 4 Setting the gas pressure The gas pressure has been set to the correct values at the factory Important The following proce dure must be followed when checking or setting the gas pres...

Страница 18: ...pressure maximum 8 bar The amount of cold water that is added is equal to the amount of hot water used The gas control block automatically regulates the gas supply The main burner will ignite as soon...

Страница 19: ...ed and serviced at least once a year by a qualified competent person 2 8 1 Sacrificial anode The life cycle of the anode is determined by the quality and the quantity of the wa ter flowing through the...

Страница 20: ...available 2 8 4 Spare parts To be able to order spare parts it is im portant to note the type of appliance as well as the serial number of the appliance Based on this information the data concerning t...

Страница 21: ...e waiting time will occur 6 Switch the ON OFF switch into ON position If the pilot fails to ignite within 25 seconds the controls will go to lock out and the reset button will need to be reset wait 15...

Страница 22: ...too low Set water temperature to higher valvue hot water 60 C recommended or none at all Thermal Reflux Safeguard After resetting the TRS activate the heater has shut down the heater If this occurs r...

Страница 23: ...ation leakage Leakage from other water If possible trace the cause and or call your heater or pipes in the vicinity installer Fault Possible cause Corrective action If a fault cannot be rectified or i...

Страница 24: ...and or energy inputs which do not exceed those stated on the rating plate of the wa ter heater d in a non corrosive atmosphere or area e with an approved temperature and pressure relief valve of adequ...

Страница 25: ...ater as suitable for purpose except within the terms of warranty detailed above STATE WATER HEATERS will not be liable by virtue of this guarantee or otherwise for damage to any persons or property wh...

Страница 26: ...probe F Transformer flame detection G Combustion products discharge safety device H Control thermostat K Safety thermostat L Timer M Remotebutton N Terminalblock P Terminalblock R Earth terminals S Co...

Страница 27: ...27...

Страница 28: ...0308 255 R1...

Отзывы: