background image

www.johnsonandstarley.co.uk

8

There must be a link between 

High Voltage terminals 1 & 

6 and high voltage terminals 

3 & 6. Make sure both links 

are present

MAF STAT CONNECTED NOT CALLING FOR HEAT (BOILER NOT FIRING) WHEN MAF STAT ON MAXIMUM

NO

YES

YES

NO

NO

YES

YES

YES

NO

YES

NO

NO

NO

NO

YES

YES

NO

Is there 230 ~ 250VAC across High Voltage terminals 2 & 4?

Is there 230 ~ 250VAC across High Voltage terminals 1 & 2?

Measure DC voltage (5.1V DC Max.) across 

Low Voltage

 terminals 3 & 4

Is measured voltage greater 

than 4.7V

Is measured resistance 

greater than 11K?

Is measured voltage greater 

than 4.7V

Check pipe sensor and 

connections. If sound, isolate 

from mains & measure resistance 

across plug J2 pins 5 & 6

Is measured voltage greater than 4.19V?

Is there an external clock fitted?

Measure DC voltage (5.1V DC 

Max.) across 

Low Voltage

 

terminals 5 & 6

Check black wire of MAF stat 

goes to 

Low Voltage

 terminal 3 

and red wire of MAF stat goes to 
low voltage terminal 4. Ensure all 

connections are sound

Check clock is on & measure 

output

Check for live supply into clock. 

Replace clock if live is present

Is 230 ~ 250VAC present?

Check harness connections 

to PCB. If all OK Replace 

PCB

Remove MAF stat connections 

and link 

Low Voltage

 terminals 

TPV & 3. Is there 230 ~ 250VAC 

across High Voltage terminals 

2 & 4?

Open circuit between clock 
out & High Voltage terminal 

block 1

Unit mains 

supply is 

missing. 

Check spur 

e.g. fuse is 

intact

Check 

connections 

to high voltage 

terminals 

2 & 3

Problem with switched live output going from High Voltage terminal 3 to 

switch live of boiler

Is there 230 ~ 250VAC across High Voltage terminals 2 & 3?

15. 

FAULT FINDING

14.3 

PCB REMOVAL

14.3.1    Disconnect the wiring at the PCB terminal block.
14.3.2    Release the 4 clips securing the PCB  and withdraw the panel, disconnecting the fan supply lead at the 

fan tray terminal block.

14.3.3    Reassembly or replacement is in reverse order.

14.4 

FAN REMOVAL

 

14.4.1  Ensure that the electrical supply is switched off and isolated.

 

14.4.2  Disconnect the 2 inline connectors on the fan assembly.

 

14.4.3  Release the screws securing the fan and withdraw if from the location runners.

 

14.4.4  Refitment or replacement is in reverse order.

14.5 

HEAT EXCHANGER REMOVAL

14.5.1    Ensure that the electrical supply is switched off and isolated.
14.5.2    Close the isolating valves and drain down the unit.
14.5.3    Release the clip and remove the heat exchanger and its associated pipework from the unit.
14.5.4    Refitment or replacement is in reverse order. Ensure that all air locks are expelled, and check for water 

soundness.

14.6 

AIR FILTER REMOVAL

14.6.1   Remove the filter cover. 
14.6.2  Remove the two air filters out by sliding it from the front of the unit.

Содержание AQUAIR S-25

Страница 1: ...Ltd Rhosili Road Brackmills Northampton NN4 7LZ Aquair Water To Air Space Heaters Aquair S 25 These instructions are to be left with the User INSTALLATION COMMISSIONING SERVICING INSTRUCTIONS AQUAIRS...

Страница 2: ...ical Data 4 6 Positioning Preparation 5 7 Installation Instructions 5 Downflow Installation Water Connections Electrical Harness 8 Return Air System 5 9 Electrical 6 10 Circuit Diagram 6 11 Fan Perfor...

Страница 3: ...ter or Cleanflow air cleaner if fitted and the heat exchanger by a centrifugal fan and is discharged through the opposite end of the unit A Summer Air Circulation switch optional provides the facility...

Страница 4: ...removal from its packaging and during installation procedure Manoeuvring the boiler may include the use of a sack truck and involve lifting pushing and pulling 4 2 2 It should be noted that this appl...

Страница 5: ...ter cover to expose the two screw holding the door in place Remove the screws and gently pull and lift the door off the unit 7 3 2 Lift the appliance onto the plenum or base support and position corre...

Страница 6: ...ough the casing at the top left hand front The cable is suitable for a 230V 50Hz single phase supply 9 2 The means of isolating the appliance MUST be via a double pole switch with a contact separation...

Страница 7: ...pipe sensor and adjusted the fan speed as required remove short 13 5 WITH THERMISTA STAT FITTED 13 5 1 Turn up thermista stat to call for heat 13 5 2 Check for 230V on switch live out 13 5 3 With the...

Страница 8: ...250VAC across High Voltage terminals 2 4 Open circuit between clock out High Voltage terminal block 1 Unit mains supply is missing Check spur e g fuse is intact Check connections to high voltage term...

Страница 9: ...n 28K YES YES NO In there 230 250 VAC across high voltage terminals 1 2 If there 230 250 VAC across High Voltage terminals 1 2 Make sure mains is present across High Voltage terminals 2 3 Is the MAF s...

Страница 10: ...IST ITEM DESCRIPTION QTY S 25 1 Air filter 2 AQ25 0185005 2 Air circulation fan with EC technology 1 1000 0525980 3 PCB control board 1 1000 0526275 4 Temperature flow sensor 1 1000 0526505 5 Front Co...

Страница 11: ...lacement Help Line 01604 752881 18 EXPLODED DIAGRAM 1 2 5 3 6 4 SPIGOT FRAME FAN SLIDER SIDE KNOCKOUTS FLYING LEAD HOT WATER FLOW FROM HEAT SOURCE HOT WATER RE TURN FROM HEAT SOURCE FIGURE 8 AQUAIR S...

Страница 12: ...arley co uk customer service johnsonandstarley co uk service johnsonandstarley co uk marketing johnsonandstarley co uk Reception Customer Service 01604 762881 In the interest of continuous developemen...

Отзывы: