4
Step by step assembly instructions
Step One
Fittings
___________________________________________________________________________
Step Two
Fittings
With the aid of an assistant steadying the panels from the back, locate the Left side panel (C) and
Right side panel (B) onto the Base unit (E) and ensure the dowels are squarely located and the
panels are kept vertical. The support for the hanging rail being at the top and the post at the rear.
Screw in 2 x 30mm screws (H) into the holes provided.
One or more persons lift up the front section (G) with the hinges on the inside and the front
inside rail with the 4 screw holes is at the bottom and place onto the top of the base unit. Push the
front up against the sides (B) & (C) so there is no gap between the vertical ends of the front panel
and the side panels. After the front has been located the person standing at the front should hold
the sides and front together by holding the palms of their hands on the sides of the front section
(G) and fingers on the sides (B) & (C) whilst the person at the back screws the front onto the
sides by first screwing in the top 2 screws (H) then the bottom 2 (H). Once these 4 screws are
fixed, the person at the front can let go and the remaining 4 screws (H) can be tightened up
H x 8
G
B
C
H
H
H
H
H
H
H
H
H
H
H x 2