5
___________________________________________________________________________
Step Two
Fittings
___________________________________________________________________________
Step Four
Fittings
__
One or more persons lift up the front section (H) with the hinges on the inside and the front
inside rail with the 4 screw holes is at the bottom and place onto the top of the base unit. Push the
front up against the sides (B) & (C) so there is no gap between the vertical ends of the front panel
and the side panels. After the front has been located the person standing at the front should hold
the sides and front together by holding the palms of their hands on the sides of the front section
(H) and fingers on the sides (B) & (C) whilst the person at the back screws the front onto the
sides by first screwing in the top 2 screws (G) then the bottom 2 (G). Once these 4 screws are
fixed, the person at the front can let go and the remaining 4 screws (G) can be tightened up
Secure the bottom of the door frame using 4 x 50mm screws (D).. Fit the Hanging rail (I) into its
cradle
G x 8
G
G
G
G
G
G
G
G
C
H
B
D
D
D
D
I
D x 4