background image

One or more persons lift up the front section (F) with the hinges on the inside and the

front inside rail with the 4 screw holes is at the bottom and place onto the top of the

base unit. Push the front up against the sides (D) & (E) so there is no gap between

the vertical ends of the front panel and the side panels. After the front has been

located the person standing at the front should hold the sides and front together by

holding the palms of their hands on the sides of the front section (F) and

fingers on the sides (D) & (E) whilst the person at the back

screws the front onto the sides by first screwing in the top 2

screws (H) then the

bottom 2 (H). Once

these 4 screws are

fixed, the person at

the front can let go and

the remaining 4

screws (H) can be

Step Two

H

H

H

Page 5 of 8

Step Three

Secure the bottom of the door frame using 4 x 30mm screws (H).

Attach 2 x Handles (K) using 1 x 25mm Bolt (I) for each handle. Fit the

Hanging rail (G) into its cradle.

Fittings

H x 4

H

I x 2

K x 2

G

I

K

Fittings

H x 8

H H H

I

K

H

H

H

H

H

D

E

F

Отзывы: