2 of 18
TABLE OF CONTENTS
ITEM
PAGE
1. SAFETY AND OPERATING INSTRUCTIONS.....................................................3
2. GENERAL
SPECIFICATIONS ................................................................................5
3. CONTENTS .................................................................................................................6
4. INSTALLATION REQUIREMENTS AND TOOLS ..............................................6
5. INSTALLATION INSTRUCTIONS.........................................................................7
5.1 UNPACKING
PROCEDURE .............................................................................7
5.2 HYDRAULIC
SYSTEM INSTALLATION.......................................................7
5.3 HYDRAULIC SYSTEM BLEEDING PROCEDURE......................................7
5.4 ANCHORING
PROCEDURE.............................................................................8
6. POSITIONING
INSTRUCTIONS ............................................................................8
7. OPERATING
INSTRUCTIONS ...............................................................................9
8. RECOMMENDED
MAINTENANCE ......................................................................9
8.1 DAILY
MAINTENANCE....................................................................................9
8.2 MONTHLY
MAINTENANCE ...........................................................................9
9. PARTS
MANUAL.......................................................................................................8
9.1 MAIN FRAME ASSEMBLY ............................................................................11
9.2 MAIN FRAME ASSEMBLY - PARTS LIST ..................................................12
9.3 HYDRAULIC
CYLINDER ASSEMBLY ........................................................13
9.4 HYDRAULIC CYLINDER ASSEMBLY - PARTS LIST..............................14
9.5 PULL-OUT
PAN ASSEMBLY .........................................................................14
9.6 PULL-OUT PAN ASSEMBLY - PARTS LIST...............................................14
9.7 POWER PACK STAND ....................................................................................15
9.8 POWER PACK STAND - PARTS LIST..........................................................16
9.9 POWER PACK: #6-2249 (AB-1425) 115-230V/1PH/60Hz.............................17
9.10 POWER PACK PARTS LIST: #6-2249 (AB-1425) 115-230V/1PH/60Hz ....18
Содержание JBC319
Страница 11: ...11 of 18 MAIN FRAME ASSEMBLY ...
Страница 13: ...13 of 18 7 4 HYDRAULIC CYLINDER ASSEMBLY ...
Страница 15: ...15 of 18 7 8 POWER PACK STAND 4 5 2 3 1 10 6 7 8 9 11 ...
Страница 17: ...17 of 18 7 10 POWER PACK 6 2249 AB 1425 115 230V 1PH 60Hz ...