background image

24

6  Slightly slacken the hinge screws. Attach the as-

sembled side casing between hinge carriers door 

and boiler block so that slots 2 click correct into 

place. Tighten the hinge screws.

8

 

Fit instrument panel 

 

to cover, passing the various 

wires through the hole. Before fitting the cover to 

the boiler pass the feeding wire

 

and the burner wire

 

through the appropriate holes and fix by using the 

wire holders as supplied in the electrical panel.

9 Threads any sensors into the appropriate open-

ings.

7  Fit the lower front panel “1”.

  Fit the upper panel “2”.

  Fit the top cover or covers “3”, according to the 

length of the boiler (see table 1, sequence C).

Fig. 8

Fig. 9

Fig. 10

Fig. 11

Содержание GIG K 200

Страница 1: ...cod 3544628 1 ediz 10 2004 GIG K AZIENDA CERTIFICATA ISO 9001 CALDAIE IN GHISA AD ALTO RENDIMENTO CAST IRON BOILER FOR HIGH EFFICIENCY MONTAGGIO MANUTENZIONE INSTALLATION MAINTENANCE...

Страница 2: ......

Страница 3: ...r eine sichere Installation Wartung und einen sicheren Gebrauch liefert Bewahren Sie diese Gebrauchsanweisung f r ein sp teres Nachschlagen sorgf ltig auf Die Installation mu von Fachpersonal ausgef h...

Страница 4: ...to in quanto forniscono importanti indicazioni riguardanti la sicurezza d installazione d uso e di manutenzione Conservare con cura questo libretto per ogni ulteriore consultazione L installazione dev...

Страница 5: ...ola mantello e scatola cruscotto Le caladaie serie GIG K sono abbinabili per la produzione di acqua calda sanitaria con un bollitore DIMENSIONI mm Fig 1 180 180 250 250 250 250 250 250 G mm 170 170 17...

Страница 6: ...80 80 80 840 200 Potenza utile Potenza focolare Pressione di esercizio Elementi Contenuto acqua Perdita di carico circuito fumi Perdita di carico circuito acqua Perdita di carico circuito acqua Mandat...

Страница 7: ...egolazione Spia blocco bruciatore Interruttore bruciatore Interruttore generale Interruttore pompa imp Termostato di sicurezza riarmo manuale Termometro riscaldamento Contaore Attacco camino Elemento...

Страница 8: ...valvola di sicurezza sul circuito riscaldamento in un punto il pi vicino possibile alla caldaia senza che vi sia tra questa e la valvola alcuna ostruzione od organo d intercettazione L apparecchio non...

Страница 9: ...ose causati per il mancato collegamento dell apparecchio ad un buon impianto di terra SCHEMA ELETTRICO DI PRINCIPIO LEGENDA IG Interruttore Generale TS Termostato Sicurezza TM Termostato di Minima 45...

Страница 10: ...O ACCENSIONE INIZIALE Effettuati i controlli preliminari si pu procedere con le seguenti manovre di accensione 1 aprire la valvola d intercettazione combustibile eventuale 2 regolare il termostato reg...

Страница 11: ...caldaia pu essere fornita con elementi smontati in 4 colli separati contenenti Mantello Cruscotto Elementi accessori per il montaggio degli elementi Seguire le istruzioni allegate al gruppo elementi p...

Страница 12: ...536 300 1186 812 406 406 250 1040 666 200 A B C D E GIG K 1852 536 536 536 406 560 1982 1608 536 536 536 650 4 Montare il pannello posteriore 1 sui prigionieri 2 e avvitare i bulloni senza stringerli...

Страница 13: ...passando i vari cavi attraverso il foro Prima di montare il coperchio sulla caldaia fare passare il cavo d alimentazione A e il cavo bruciatore B attraverso gli appositi fori e bloccarli tramite i pr...

Страница 14: ...is manual as they give important safety instructions regarding installation use and maintenance Keep this manual for future reference Installation must be carried out by qualified personnel who will b...

Страница 15: ...cerning the safety of installation of use and of maintenance of the product Keep the present manual in a secure place so that it can be referred to whenever deemed necessary Installation must be carri...

Страница 16: ...el box The GIG K series boilers can be combined witha hot water cylinder for the production of sanitary hot water DIMENSIONS mm D E D C A G Fig 1 180 180 250 250 250 250 250 250 G mm 170 170 170 170 1...

Страница 17: ...temperature B1 Fig 1 CH return intlet Low temperature B2 Fig 1 Weight 480 516 6 12 243 1 7 77 80 80 80 80 1390 480 420 452 6 11 223 1 4 65 80 80 80 80 1280 420 360 388 6 10 203 1 0 54 80 80 80 80 117...

Страница 18: ...ROL PANEL REGULATION THERMOSTAT BURNER BLOCKING ODE LIGHT BURNER SWITCH MAIN SWITCH SYS PUMP SWITCH SAFETY THERMOSTAT manual reset HEATING THERMOMETER HOUR METER Chimney attachment Rear element Middle...

Страница 19: ...ty valve on the heating circuit in the closest possible point to the boiler without there being any obstruction or cut off mechanism between the boiler and the valve The unit is not supplied with an e...

Страница 20: ...persons or things caused by the failure to connect the unit to a properly earthed system PRINCIPLE WIRING DIAGRAM LEGEND IG Main switch TS Safety thermostat TM Minimum temp thermostat 45 C TA Room the...

Страница 21: ...STARTING SHUT OFF FIRST STARTING After making preliminary checks perform the following starting procedures 1 open the fuel on off valve if present 2 set the regulation thermostat Fig 2 to the value re...

Страница 22: ...2 Prepare the right and left sides choosing the quantity of side panels according to the dimensions of the boiler see table 3 Connect the panels together using the screws 1 the washers 2 and the nuts...

Страница 23: ...0 1316 942 406 536 300 1186 812 406 406 250 1040 666 200 A B C D E GIG K 1852 536 536 536 406 560 1982 1608 536 536 536 650 4 Fit the rear panel 1 on the studs 2 and loosely tighten the bolts 5 Fasten...

Страница 24: ...ious wires through the hole Before fitting the cover to the boiler pass the feeding wire and the burner wire through the appropriate holes and fix by using the wire holders as supplied in the electric...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...95 GRUGLIASCO TORINO ITALIA TEL 011 40221 CAS POSTALE 1393 10100 TORINO TELEX 220364 IOTERM I TELEGR TF78 42 42 JOANNES TORINO TELEFAX 011 780 40 59 BRUCIATORI DI GASOLIO GAS NAFTA CALDAIE MURALI A GA...

Отзывы: