
18
WIRING SCHEME
The wiring scheme to be carried out by technician are:
— Power Supply Line
— Thermostats Line
— Eventual blocking lamp and/or hour-meter
ATTENTION:
— Do not invert neutral with phase.
— Ensure a good earth connection.
INDEX
CO
HOUR-METER
F
FUSE
FA
ANTI-INTERFERENCE FILTER
FR
PHOTORESISTANCE
IG
MAIN SWITCH
LS
SAFETY LAMP
MA
CONTROL BOX TERMINAL STRIP
MB
BURNER MOTOR
PB
BURNER CONNECTOR
SC
PLUG
TA-TC
BOILER ENVIRONMENT THERMOSTAT
TR
IGNITION TRANSFORMER
TS
SAFETY THERMOSTAT
VE
ELECTROMAGNETIC VALVE
1
2 2 3 4 5 6 7 8
101112
9
TR
M
MB
VE
FR
2
FA
MA
TC-TA
TS
F
IG
B4
T2 T1 N
L1
S3
L
N
LS
N
N
CO
Z
H
PB
SC
1009DIS395
1
2 2 3 4 5 6 7 8
101112
9
TR
M
MB
VE
FR
PR
2
FA
MA
TC-TA
TS
F
IG
B4
T2 T1 N
L1
S3
L
N
LS
N
N
CO
Z
H
PB
SC
1009DIS395
AZ 3 N
AZ 3 N/L
AZ 3 N-PR
PR
PREHEATER
Содержание AZ 3 N
Страница 2: ...2...
Страница 15: ...15...
Страница 27: ...27...
Страница 39: ...39...
Страница 40: ...Cod 97 00420 0 FINTERM S p A Corso Allamano 11 10095 Grugliasco TO TEL 011 40221 FAX 011 7804059 06 2010...