
6.
Move the hook-post backwards but not
fully. Make sure the body's centre of grav-
ity remains in front of the Hookmaster's
rollers.
Fast operation mode must only
be used with minimal load.
7.
Transfer the body to the trailer using the sledge and hook-post.
8.
During the final part of the transfer, the tip frame can be used to push the body further onto
the trailer.
38
Shunting a Body |
Hookmaster manual: 13293 Edition 6 | 2021-02-22
Содержание Hookmaster
Страница 2: ...Hookmaster manual 13293 Edition 6 2021 02 22...
Страница 6: ...vi Introduction Hookmaster manual 13293 Edition 6 2021 02 22...
Страница 12: ...6 About the Hookmaster Design Hookmaster manual 13293 Edition 6 2021 02 22...
Страница 14: ...8 Body Standard Hookmaster manual 13293 Edition 6 2021 02 22...
Страница 28: ...22 Operation Air Systems Emergency Stop Hookmaster manual 13293 Edition 6 2021 02 22...
Страница 40: ...34 Loading a Body Hookmaster manual 13293 Edition 6 2021 02 22...
Страница 52: ...46 Service and Maintenance Working on the Hook Lift Hookmaster manual 13293 Edition 6 2021 02 22...
Страница 56: ...50 Technical Data Hookmaster manual 13293 Edition 6 2021 02 22...
Страница 58: ...52 Fault Tracing the Hook Lift Hookmaster manual 13293 Edition 6 2021 02 22...