 Phazr Hub and AmpliFi HD Router System Installation

Installation & Setup Guide

Note: Only JLM Energy Devices (Phazrs, Linez, Loadz) should be used 

on this router to prevent communication issues to the equipment.

1.

Install router and mesh points according to the AmpliFi instruction manual. Connect

the AmpliFi router into the homeowner’s modem if there is an extra LAN port. If not,

plug the ethernet cable into one of the available LAN ports on their home router.

1

  

Install Phazr Hub by plugging the provided micro USB cord and

ethernet cable into the Amplifi Router.

Info:

 Make sure to position the mesh points to connect 

between the solar system where the Phazrs will 

be installed, Linez unit at the main panel and the 

router location to get the best signal strength.

Info:

 Installing one mesh point into the outlet where the 

garage door opener is located (ceiling of the 

garage) provides a good location for the Linez unit 

if the Main Service Panel is close to the garage.

7

Содержание Phazr

Страница 1: ...ide The following guide details the steps and procedures to properly install and commission a JLM Phazr system If you require assistance during the installation or commissioning of a Phazr system plea...

Страница 2: ...1 1 Roof Type and Mounting System Options 1 2 Mounting Phazr 2 0 Application App Installation 3 0 Phazr Hub and AmpliFi HD Router System Installation 4 0 Phazr Configuration 4 1 Linez Installation 5 0...

Страница 3: ...Phazr to the micro inverter are three feet 3 long Be sure that you do not mount the Phazrs and micro inverters or DC power optimizer too far apart WARNING Ensure the DC jumper wires from the Phazr to...

Страница 4: ...tween stand offs to avoid excessive twisting of the racking Racking Iron Ridge XR1000 or equivalent Must be mounted as far up on the L Bracket as possible for proper Phazr clearance L Bracket Iron Rid...

Страница 5: ...their associated truck cable AC connection prior to mounting Phazr for an easier installation process 1 Mount each Phazr to the mounting rail using two 1 4 micro inverter mounting T bolts Iron Ridge M...

Страница 6: ...ounding system using the factory installed grounding lug on the Phazr 3 Unpackage the provided DC jumper cables and plug them into the Phazr DC OUT terminals Plug the other end of the cables into the...

Страница 7: ...nto the Phazr DC IN terminals and mount the PV module to the rails DC IN 2 0 Application App Installation 1 Search for JLM Energy in Google Play Android or the App Store Apple and you will find the Me...

Страница 8: ...the ethernet cable into one of the available LAN ports on their home router 1 Install Phazr Hub by plugging the provided micro USB cord and ethernet cable into the Amplifi Router Info Make sure to pos...

Страница 9: ...m of the Phazr Hub and hit Next Click the select all button to select all Phazrs Checkmarks will appear in all the configure and Measurz boxes Once all Phazrs are completed hit Next and the process fo...

Страница 10: ...ted network Once Linez is installed and powered on it will automatically connect to Measurz 5 0 Completing Installation Call into JLM Customer Service Support at 800 475 3960 to verify connectivity to...

Отзывы: