JLM Phazr Скачать руководство пользователя страница 4

Installation & Setup Guide

Info:

 If utilizing the parts and materials listed in a specific mounting 

system, all parts listed for the system MUST be used.

The following mounting systems have been tested and proven to work with Phazr. These options are 

not specifically required for use with Phazr and are listed only as examples. It is the responsibility of the 

installer to provide mounting systems that provide the required clearances for Phazr.

Info:

 The Phazr chassis is 3” tall.

Info:

 

The minimum clearance between Phazr and the roof is 2”.

Info:

 The top of the racking must be a minimum of 5” above the 

surface of the roof.

1.1

 Roof Type & Mounting System Options

Caution: 

When using rails that utilize 5/16” mounting hardware, the 

mounting slots of Phazr are designed for 1/4” hardware and must 

be drilled out with a step bit if the 5/16” hardware is used.

Stand-off

Quick Mount Q-Block or equivalent

Recommend no more than 48” between stand-offs to avoid 
excessive twisting of the racking.

Racking

Iron Ridge XR1000 or equivalent

Must be mounted as far up on the L-Bracket as possible for proper 
Phazr clearance.

L-Bracket

Iron Ridge FM-LFT-003 or equivalent

Stand-off

Quick Mount #QMHSS or equivalent

Recommend no more than 48” between stand-offs to avoid 
excessive twisting of the racking.

Racking

Iron Ridge XR1000 or equivalent

Must be mounted as far up on the QMHSS slot as possible for proper 
Phazr clearance.

L-Bracket

Iron Ridge FM-LFT-003 or equivalent

Stand-off

Quick Mount PV Base Mount
#QMTR-BM or equivalent

Recommend no more than 48” between stand-offs to avoid 
excessive twisting of the racking.

Quick Mount PV Tile Replacement 
Kit #QMTR-S3.25 or equivalent

Quick Mount PV 4.5” Post
#QMC-SP4.5 (or taller) or equivalent

Typical minimum order of 4.5” post is 12 with a 5-day lead time.

Racking

Iron Ridge XR1000 or equivalent

Must be mounted as far up on the L-Bracket as possible for proper 
Phazr clearance.

L-Bracket

Iron Ridge FM-LFT-003 or equivalent

Asphalt Shingle 

System

Flat Tile

System

S-Tile & W-Tile

System

3

EXAMPLE

EXAMPLE

EXAMPLE

Содержание Phazr

Страница 1: ...ide The following guide details the steps and procedures to properly install and commission a JLM Phazr system If you require assistance during the installation or commissioning of a Phazr system plea...

Страница 2: ...1 1 Roof Type and Mounting System Options 1 2 Mounting Phazr 2 0 Application App Installation 3 0 Phazr Hub and AmpliFi HD Router System Installation 4 0 Phazr Configuration 4 1 Linez Installation 5 0...

Страница 3: ...Phazr to the micro inverter are three feet 3 long Be sure that you do not mount the Phazrs and micro inverters or DC power optimizer too far apart WARNING Ensure the DC jumper wires from the Phazr to...

Страница 4: ...tween stand offs to avoid excessive twisting of the racking Racking Iron Ridge XR1000 or equivalent Must be mounted as far up on the L Bracket as possible for proper Phazr clearance L Bracket Iron Rid...

Страница 5: ...their associated truck cable AC connection prior to mounting Phazr for an easier installation process 1 Mount each Phazr to the mounting rail using two 1 4 micro inverter mounting T bolts Iron Ridge M...

Страница 6: ...ounding system using the factory installed grounding lug on the Phazr 3 Unpackage the provided DC jumper cables and plug them into the Phazr DC OUT terminals Plug the other end of the cables into the...

Страница 7: ...nto the Phazr DC IN terminals and mount the PV module to the rails DC IN 2 0 Application App Installation 1 Search for JLM Energy in Google Play Android or the App Store Apple and you will find the Me...

Страница 8: ...the ethernet cable into one of the available LAN ports on their home router 1 Install Phazr Hub by plugging the provided micro USB cord and ethernet cable into the Amplifi Router Info Make sure to pos...

Страница 9: ...m of the Phazr Hub and hit Next Click the select all button to select all Phazrs Checkmarks will appear in all the configure and Measurz boxes Once all Phazrs are completed hit Next and the process fo...

Страница 10: ...ted network Once Linez is installed and powered on it will automatically connect to Measurz 5 0 Completing Installation Call into JLM Customer Service Support at 800 475 3960 to verify connectivity to...

Отзывы: