SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
3121636
– JLG Lift –
6-11
Figure 6-5. Component Maintenance Intervals - X500AJ - Lithium-Ion Machine
PART
MAINTENANCE
WORK
BEFORE
STARTING
AS NEEDED
INTERVAL (HOURS)
10
50
100 250
500 1000
HYDRAULIC OIL
CHECK LEVEL
•
CHANGE
•
HYDRAULIC OIL
FILTER
REPLACE
CARTRIDGE
•
*
•
ARTICULATE
JOINT POINTS
GREASING
•
*
•
REDUCTION GEAR
OIL
CHECK LEVEL
•
CHANGE
•
*
•
MACHINE
GENERAL PERIODICAL
CHECKS
•
•
*
EXTENSION ARM
INTERNAL SLIDING
RING
CHECK WEAR
•
REPLACE
•
TURNTABLE BOLT
TIGHTENING
CHECK
•
*
•
LITHIUM-ION
MACHINE
*
First time service interval
then per chart thereafter.
**
Every 3 months or
1000 hrs of operation.
***
Every 5 years or
2000 hrs of operation.
#
Check every year.
If the torque is not
correct replace the nuts
with two new nuts of
the same specification.
Install dry without
using oil or grease to
specified torque.
SERV...
To
order go
to
Discount-Equipment.com