SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2-4
– JLG Lift –
3121189
2.3 PRE-START INSPECTION
The Pre-Start Inspection should include each of the following:
1. Cleanliness –
Check all surfaces for leakage (oil, fuel,
or battery fluid) or foreign objects. Report any leakage to
the proper maintenance personnel.
2. Decals and Placards
– Check all for cleanliness and
legibility. Make sure none of the decals and placards are
missing. Make sure all illegible decals and placards are
cleaned or replaced.
3. Operators and Safety Manuals
– Ensure a copy of the
Operator and Safety Manual, EMI Safety Manual
(Domestic only), and ANSI Manual of Responsibilities
(Domestic only) is enclosed in the weather resistant
storage container.
4. Walk-Around Inspection
– Refer to Figure 2-1. on page
5. Battery –
Charge as required.
6. Fuel
(Combustion Engine Powered Machines Only)
–
Add the proper fuel as necessary.
7. Hydraulic Oil
– Check the hydraulic oil level. Ensure
hydraulic oil is added as required. See Section 7 for
hydraulic oil specifications.
8. Function Check
– Once the “Walk-Around” Inspection
is complete, perform a function check of all systems in
an area free of overhead and ground level obstructions.
Refer to Section 3 for specific operating instructions.
IF THE MACHINE DOES NOT OPERATE PROPERLY, TURN OFF THE
MACHINE IMMEDIATELY! REPORT THE PROBLEM TO THE PROPER MAIN-
TENANCE PERSONNEL. DO NOT OPERATE THE MACHINE UNTIL IT IS
DECLARED SAFE FOR OPERATION.
Содержание 19AMI
Страница 2: ......
Страница 34: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 6 JLG Lift 3121189 This page intentionally left blank...
Страница 46: ...SECTION 4 MACHINE OPERATION 4 12 JLG Lift 3121189 This page intentionally left blank...
Страница 61: ...SECTION 7 GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE 3121189 JLG Lift 7 7 1 2 3...
Страница 66: ......