Section 4—Operation
4-12
31211031
Transporting a Suspended Load
• Travel in accordance with the requirements set forth in Section 1—General Safety
Practices and Section 5—Attachments.
• For additional requirements, refer to appropriate capacity chart in operator cab.
Important things to remember:
• Ensure boom is fully retracted.
• Never raise load more than 11.8 in (300 mm) above ground surface or boom more
than 45°.
• Combination of frame leveling and load could cause telehandler to tip over.
• Guide persons and operator must remain in constant communication (verbal or hand)
and be in visual contact with operator at all times.
• Never place guide persons between suspended load and telehandler.
• Only transport load at walking speed, 0.9 mph (0.4 m/s), or less.
Leveling Procedure
1. Position machine in best location to lift or place load.
2. Apply parking brake and shift transmission to NEUTRAL.
3. Observe level indicator(s) to determine whether machine must be leveled prior to
lifting load. If equipped, level machine with frame level switch (see page 3-3) or
outrigger controls (see 3-15).
4. Move boom so load is no more than 11.8 in (300 mm) above ground surface and
boom/or boom is raised no more than 45°.
OW01
3
0
O
Z3
160
Содержание 1043
Страница 12: ...Table of Contents vi 31211031 ...
Страница 46: ...Section 2 Pre Operation and Inspection 2 18 31211031 This Page Intentionally Left Blank ...
Страница 94: ...Section 4 Operation 4 16 31211031 This Page Intentionally Left Blank ...
Страница 102: ...Section 5 Attachments 5 8 31211031 This Page Intentionally Left Blank ...
Страница 144: ...Section 5 Attachments 5 50 31211031 This Page Intentionally Left Blank ...
Страница 148: ...Section 6 Emergency Procedures 6 4 31211031 This Page Intentionally Left Blank ...
Страница 155: ...Section 7 Lubrication and Maintenance 7 7 31211031 This Page Intentionally Left Blank ...
Страница 157: ...Section 7 Lubrication and Maintenance 7 9 31211031 1055 1255 OD1300 50 EVERY B B B B B B ...
Страница 158: ...Section 7 Lubrication and Maintenance 7 10 31211031 250 Hour Lubrication Schedule 642 943 1043 250 EVERY O 0020 C ...
Страница 159: ...Section 7 Lubrication and Maintenance 7 11 31211031 1055 1255 250 EVERY OD1310 ...
Страница 160: ...Section 7 Lubrication and Maintenance 7 12 31211031 1000 Hour Lubrication Schedule 642 943 1043 1000 EVERY O 0030 C ...
Страница 161: ...Section 7 Lubrication and Maintenance 7 13 31211031 1055 1255 1000 EVERY OD1320 ...
Страница 162: ...Section 7 Lubrication and Maintenance 7 14 31211031 This Page Intentionally Left Blank ...
Страница 165: ...Section 7 Lubrication and Maintenance 7 17 31211031 This Page Intentionally Left Blank ...
Страница 180: ...Section 8 Additional Checks 8 2 31211031 This Page Intentionally Left Blank ...
Страница 187: ...Section 9 Specifications 9 7 31211031 Wheel Lug Nut Torque 375 25 lb ft 508 34 Nm ...
Страница 196: ...Index 4 31211031 ...
Страница 198: ...Inspection Maintenance and Repair Log Date Comments ...
Страница 200: ......