Section 2—Pre-Operation and Inspection
2-2
31211031
2.2
PRE-OPERATION CHECK AND INSPECTION
Note:
Complete all required maintenance before operating unit.
The pre-operation check and inspection, performed at beginning of each work shift or at
each change of operator, should include the following:
1.
Cleanliness
—Check all surfaces for leakage (oil, fuel or battery fluid) or foreign
objects. Report any leakage to the proper maintenance personnel.
2.
Structure
—Inspect the machine structure for dents, damage, weld or parent metal
cracks or other discrepancies.
3.
Safety Decals
—Ensure all safety decals are legible and in place. Clean or replace as
required. See page 2-3 for details.
4.
Operation and Safety Manuals
—Operation & Safety Manual and AEM Safety
Manual (ANSI only) located in cab manual holder.
5.
Walk-Around Inspection
—See page 2-12 for details.
6.
Fluid Levels
—Check fluids, including fuel, diesel exhaust fluid (DEF), hydraulic oil,
engine oil and coolant. When adding fluids, refer to Section 7—Lubrication and
Maintenance and Section 9—Specifications to determine proper type and intervals.
Before removing filler caps or fill plugs, wipe all dirt and grease away from the ports.
If dirt enters these ports, it can severely reduce component life.
7.
Attachments/Accessories
—Ensure correct capacity charts are installed on
telehandler. If provided, reference Operation & Safety Manual of each attachment or
accessory installed for specific inspection, operation and maintenance instructions.
WARNING
FALL HAZARD.
Use extreme caution when checking items beyond your normal reach.
Use an approved ladder.
O
A
H1000
PARENT METAL CRACK
WELD CRACK
Содержание 1043
Страница 12: ...Table of Contents vi 31211031 ...
Страница 46: ...Section 2 Pre Operation and Inspection 2 18 31211031 This Page Intentionally Left Blank ...
Страница 94: ...Section 4 Operation 4 16 31211031 This Page Intentionally Left Blank ...
Страница 102: ...Section 5 Attachments 5 8 31211031 This Page Intentionally Left Blank ...
Страница 144: ...Section 5 Attachments 5 50 31211031 This Page Intentionally Left Blank ...
Страница 148: ...Section 6 Emergency Procedures 6 4 31211031 This Page Intentionally Left Blank ...
Страница 155: ...Section 7 Lubrication and Maintenance 7 7 31211031 This Page Intentionally Left Blank ...
Страница 157: ...Section 7 Lubrication and Maintenance 7 9 31211031 1055 1255 OD1300 50 EVERY B B B B B B ...
Страница 158: ...Section 7 Lubrication and Maintenance 7 10 31211031 250 Hour Lubrication Schedule 642 943 1043 250 EVERY O 0020 C ...
Страница 159: ...Section 7 Lubrication and Maintenance 7 11 31211031 1055 1255 250 EVERY OD1310 ...
Страница 160: ...Section 7 Lubrication and Maintenance 7 12 31211031 1000 Hour Lubrication Schedule 642 943 1043 1000 EVERY O 0030 C ...
Страница 161: ...Section 7 Lubrication and Maintenance 7 13 31211031 1055 1255 1000 EVERY OD1320 ...
Страница 162: ...Section 7 Lubrication and Maintenance 7 14 31211031 This Page Intentionally Left Blank ...
Страница 165: ...Section 7 Lubrication and Maintenance 7 17 31211031 This Page Intentionally Left Blank ...
Страница 180: ...Section 8 Additional Checks 8 2 31211031 This Page Intentionally Left Blank ...
Страница 187: ...Section 9 Specifications 9 7 31211031 Wheel Lug Nut Torque 375 25 lb ft 508 34 Nm ...
Страница 196: ...Index 4 31211031 ...
Страница 198: ...Inspection Maintenance and Repair Log Date Comments ...
Страница 200: ......