NBT
series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance
Installation
1. Remove all bolts and nuts from the clear cover.
2. Remove shipping bubble wrap and safely discard.
3. Remove “Date of installation label” and the “red warranty tag”.
4. Remove the pH Power Pellet® bags.
5. Remove porous pellet bags from plastic shipping bags before placing in the NBT tank.
Floor mounting units:
1. Place the NBT tank in a location where it will not be a foot traffic hazard.
2. Use clamps on inlet & outlet piping.
Operational Flow:
1. Once the heating unit is fired and acidic condensate is produced the condensate will flow from the heater condensate drain down
into the NBT tank’s inlet port. The acidic condensate enters the bottom chamber of the tank below the flow baffle. The acid will now
flow up through the baffle ports via gravity and slight head pressure at which point it comes in contact with the Magnesium Hydroxide
Pellet bag (pH Power Pellets®). A chemical reaction now takes place in which ions from the acid and pellets are exchanged raising
the ph level of the acid in the range of 5.0 to 9.0 pH. In this ranged the condensate can be safely be put to a waste drain via the NBT’s
outlet port and piping.
3