Note
:
Build sun& rain shade to avoid direct
exposure to sunlight and rain.
Note
: The switch connect PCS to JKS-B5150-BI, we recommend the use of molded case circuit breaker
with rated working voltage greater than 80V and rated working current greater than 125A.
6.Terminal Connection
8.Key Operation
Power Button
Situation
System of f
System on
Touch
Press(
<
2S)
Press(
≥
2S)
Press once
No reaction
Power on
Shut down
9.Service and Contact
Jinko Solar Co., Ltd.
Installation Procedure
6
7
8
9
10
GND terminal
Positive terminal
USB interface
LED indicator
Power button
1
2
3
4
5
PCS CAN communication
LINK-IN CAN communication
LINK-OUT CAN communication
Safety vent
Negative terminal
3-2
4.Installation Environment
5.Wire Connection
Connection End Face Introduction
5-1
Diagram of Wiring Connection
5-2
Power Terminal
6-1
Note:
Avoid drilling holes in the water pipes and cables buried in the wall.
Note
: When multiple battery modules are used in parallel connection, you only need to press one key of any module to start the system,
and also press one key to shut down the battery system.
ALM/RUN light turns green when powered on
11
Communication Terminal
6-2
7.Battery System Switch Operation
Power ON Battery System
Power OFF Battery System
Turn the circuit breaker to the "ON" position. Press the
power button for 3 seconds to turn on the battery. The
battery LED indicator lights up to indicate that the battery
has been turned on.
Turn the circuit breaker to the "OFF" position.
Press the power button to turn of f the battery.
The battery LED indicator is of f , and the battery
has been turned of f .
Circuit breaker
11
No.1, Jinko Road, Shangrao Economic Development Zone Shangrao City,
Jiangxi Province, 334100, P.R. China
www.jinkosolar.com