Installation Manual
Checklist
Unpacking and Inspection of Material
Lifting/Unloading
Before starting the installation, check that the items listed below are attended to:
Space requirements in regards to installation and services
•
Dimensions of pipe and canal connections
•
Holes in the wall for pipes and cables
•
Supply of electricity
•
If any of these items are not attended to, please follow the instructions in the Planning Ma-
nual.
Before starting the installation, check that the items listed below are attended to:
Same current on all electrical phases (not required when single phase)
•
Capacity of the main fuse (it must be suitably rated)
•
Unpack the material and check to see that it has nothing missing or anything damaged due
to transportation. Any damages due to transportation should be immediately reported to the
transporter and to Jifon AB.
Consider the following when lifting/unloading the AquaHeat coil and the heat pump module:
Be careful not to damage the material when lifting and unloading.
•
A lifting device or a minimum of 3 people are recommended when unloading.
•
Th
e heat pump module must only be transported in the vertical position.
•
Secure tightly to ensure
that the units are unable
to turn over or slide out of
the lifting device.
NOTE!
Installation Manual
Содержание AquaHeat 13
Страница 28: ...AH 01 28 Installation Manual Wiring Diagrams Three phase 400 V...
Страница 29: ...29 AH 01 Installation Manual...
Страница 30: ...AH 01 30 Installation Manual...