OM131
85
P1939-OM-131 R11
Chapter 4
1.
Ensure that the gas cylinders are empty by activating the SLS System and pressing down on
the demand valve diaphragm with the demand valve activating tool (Divex Part No. M2922)
from the Tool and Test Kit.
2.
Remove the plug (Fig 4.14, Item 1) taking care to avoid damaging the face of the plug
contacting the burst disc (Fig 4.14, Item 2).
N
OTES
(1) A new burst disc must be fitted every time the plug is removed.
(2) Inspect for burrs, sharp edges etc before replacing the burst disc.
3.
Check the condition of the seat (Fig 4.14, Item 3).
4.
Tighten the plug (Fig 4.14, Item 1) to the recommended torque setting of 6.78 Nm (5 lb-ft).
5.
Charge the gas cylinders to 300 bar after re-assembly and leak test with Snoop (or
equivalent).
4.5.6
Demand regulator body replacement
N
OTE
All normal maintenance can be carried out without having to remove the regulator body from the
SLS System. This should only be carried out if there has been damage to the body.
1.
Release the wing nut and remove the thermal regenerator (Fig 3.7, Item 1).
2.
Dismantle the regulator (section 4.3.4.4).
3.
Using the duct spanner (Divex Part No. M2921B) unscrew the inner sleeve from the duct,
whilst holding the demand regulator until the demand regulator body (Table 4.1, Item 1)
comes off.
4.
Replacement is the reverse of the above.
5.
Lightly lubricate O-rings before re-assembly using an oxygen compatible lubricant (e.g.
Christo-lube fluorinated grease - Divex Part No SM034).
6.
Check the operation of the demand regulator (section 4.3.2.6).
4.5.7 Harness
replacement
1.
Disconnect the counterlung hoses and inhale / exhale hoses from the Backpack.
2.
Remove the counterlung enclosures complete with counterlungs.
3.
Ensure that the gas cylinders are empty by activating the SLS System and pressing down on
the demand valve diaphragm with the demand valve activating tool (Divex Part No. M2922)
from the Tool and Test Kit.
4.
Remove the two stage regulator (section 4.3.4.2).
5.
Remove the single stage regulator (section 4.3.4.3).
Содержание Divex SLS Mk IV
Страница 2: ...Intentionally Blank...
Страница 4: ...ii OM131 Approval Sheet P1939 OM 131 R11 Intentionally Blank...
Страница 6: ...iv OM131 Preface P1939 OM 131 R11 Intentionally Blank...
Страница 8: ...vi OM131 List of Abbreviations P1939 OM 131 R11 Intentionally Blank...
Страница 10: ...viii OM131 Warnings P1939 OM 131 R11 Intentionally Blank...
Страница 12: ...x OM131 Table of Contents P1939 OM 131 R11 Intentionally Blank...
Страница 15: ...OM131 3 P1939 OM 131 R11 Chapter 1 Fig 1 1 SLS System Mk IV...
Страница 16: ...4 OM131 Chapter 1 P1939 OM 131 R11 Fig 1 2 SLS system layout...
Страница 32: ...20 OM131 Chapter 2 P1939 OM 131 R11 Fig 2 4 Two stage regulator Fig 2 5 Spool valve...
Страница 42: ...30 OM131 Chapter 2 P1939 OM 131 R11 Intentionally Blank...
Страница 53: ...OM131 41 P1939 OM 131 R11 Chapter 3 Fig 3 3 Hose Lanyards...
Страница 54: ...42 OM131 Chapter 3 P1939 OM 131 R11 Fig 3 4 SLS System Mk IV Rear View...
Страница 55: ...OM131 43 P1939 OM 131 R11 Chapter 3 Fig 3 5 SLS System Mk IV Front View...
Страница 64: ...52 OM131 Chapter 3 P1939 OM 131 R11 Intentionally Blank...
Страница 82: ...70 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 7 Annual Maintenance Two Stage Regulator...
Страница 86: ...74 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 8 Annual Maintenance Single Stage Regulator...
Страница 109: ...OM131 97 P1939 OM 131 R11 Chapter 5 Fig 5 2 Backpack Assembly Drawing P1939229S1...
Страница 111: ...OM131 99 P1939 OM 131 R11 Chapter 5 Fig 5 4 Scrubber Housing Assembly Drawing P1939131S1...
Страница 113: ...OM131 101 P1939 OM 131 R11 Chapter 5 Fig 5 6 SLS System Mk IV Inhale Exhale Duct Assembly Drawing P1939 DG 142...
Страница 115: ...OM131 103 P1939 OM 131 R11 Chapter 5 Fig 5 7 SLS System Mk IV Counterlung Duct Assembly Drawing P1939 DG 159...
Страница 118: ...106 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 9 SLS System Mk IV Gas Schematic Drawing P193940S1...
Страница 123: ...OM131 111 P1939 OM 131 R11 Chapter 5 Fig 5 14 SLS System Mk IV Bottle Assembly...
Страница 125: ...OM131 113 P1939 OM 131 R11 Chapter 5 Fig 5 15 SLS System Rotowink General Assembly Drawing P1939 DG 59...
Страница 127: ...OM131 115 P1939 OM 131 R11 Chapter 5 Fig 5 16 SLS System Mk IV Hot Water System Drawing P1939156S1...
Страница 129: ...OM131 117 P1939 OM 131 R11 Chapter 5 Fig 5 18 Shroud Hot Water Hose Assembly Drawing P1939 DG 83282...
Страница 130: ...118 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 19 SLS System Hot Water Shroud Assembly Drawing B82840...
Страница 132: ...120 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 20 Refillable Canister Assembly Drawing P1939 DG 035...
Страница 133: ...OM131 121 P1939 OM 131 R11 Chapter 5 Fig 5 21 SLS System Mk IV Harness Assembly Drawing P1939137S1...
Страница 134: ...122 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 22 SLS System Mk IV Actuation Cable Assembly Drawing P1939 DG 115...
Страница 135: ...OM131 123 P1939 OM 131 R11 Chapter 5 Fig 5 23 SLS System Mk IV Counterlung Assembly Drawing P1939 DG 56...