12
Rack (5)
Itens which follow the rack
5a- Locking pin
5b- Tightening lever
5c- Bolts and nuts to fastening the lever (5b)
5d- Pulley with 2 grooves
5e- Machine driving chain
5f- Engine fastening elements
5g- Fastening elements of the sliding rails (5h)
5h- Sliding rails
5i- Machine fastening elements
See instructions on next page to install the rack (5).
ATTENTION: Items 5d and 5e only accompany the machines that leaves the factory with
the motor.
5i
5h
5g
5f
5e
5a
5b
5c
5d
5
Содержание 5D
Страница 1: ...MILL MOLINO M QUINAS AGR COLAS JF 5D 10D Rev 00 OPERATION TECHNICAL MANUAL MANUAL T CNICO DE OPERACI N...
Страница 2: ......
Страница 32: ...32 9 Adhesives found on the machine...
Страница 36: ...36...
Страница 37: ......
Страница 68: ...32 9 Adhesivos encontrados en la m quina...
Страница 72: ...36...
Страница 73: ......
Страница 75: ......