Final Inspec�on
Once the flue system has been installed, a final inspection should be carried out.
Particular a�ention should be paid to:
•
50mm clearance requirement to combustibles from Safety Vent AIR pipe
•
100mm clearance requirement to combustibles from stove pipe
•
150mm clearance from transi�on to ceiling (stove pipe to safety vent) requirements
•
Flue height requirements per AS/NZS 2919
Elbow support bracket kit
VF-3-60-246
Use of bends
45o Bends can be used on this flue system. Either the stove pipe flue or the VisionLINE safety vent
flue can be offset. A maximum of two (2) sets of 45o elbows can be used. A maximum of 1800mm in
total can be run at a 45o angle.
If you are offse�ing VisionLINE safety vent pipe, you MUST brace the offset appropriately. 2
VisionLINE braces must be used to support the flue. (See fig 7) Furthermore, the joins must be sealed
using VisionLINE clamp braces (See fig 7)
FIG 7
PAGE 6