10
4.3 Tools required for assembly
Hex keys, 4mm and 5mm (provided)
Open-end wrench, 10/12mm (provided)
Cross-point (Phillips) screwdriver
4.4 Assembly
1.
Install four casters (L) to base (C). See Figure
3.
2.
Install left and right stands (D
1
,D
2
) to base (C)
with flange head screws (HP8).
3.
Install stand support (R) to base (C) with
flange head screws (HP4).
Figure 3
4.
Install four casters (L) into the threaded nuts
beneath drum (F). See Figure 4.
Figure 4
5.
Lift main housing (A) using hoist with straps
through lifting rings atop main housing. If
hoist is not available, at least
2 persons
must
lift housing.
Main housing is heavy. Two-
person lift, or use hoist.
6.
Position main housing (A) between left and
right stands (D
1
,D
2
), and secure with six
flange head screws (HP2). See Figure 5.
Figure 5
7.
Install funnel (B) beneath main housing.
Secure with funnel clamp (G). See Figure 6.
Tighten screw on funnel clamp securely.
Figure 6
Содержание JCDC-1.5
Страница 46: ...2 Parts Breakdown for JCDC 1 5 M Cyclone Dust Collector ...
Страница 49: ...5 Circuit Diagram for JCDC 1 5 M Cyclone Dust Collector JCDC 1 5 M 717515M 1 230V 50Hz ...
Страница 51: ...7 Aufschlüsselung der Teile für den Fliehkraft Staubabscheider JCDC 1 5 M ...
Страница 56: ...12 Défaillance des pièces du collecteur de poussière cyclonique JCDC 1 5 M ...