8
5.3
Tools required for assembly
Hex keys, 4mm and 5mm (provided)
Open-end wrench, 10/12mm (provided)
Cross-point (Phillips) screwdriver
5.4
Assembly
1. Install four casters (L) to base (C). See Figure
3.
2. Install left and right stands (D
1
,D
2
) to base (C)
with flange head screws (HP8).
3. Install stand support (R) to base (C) with flange
head screws (HP4).
Figure 3
4. Install four casters (M) into the threaded nuts
beneath drum (F). See Figure 4.
Figure 4
5. Lift main housing (A) using hoist with straps
through lifting rings atop main housing. If hoist
is not available, at least
2 persons
must lift
housing.
Main housing is heavy.
Two-person lift, or use hoist.
6. Position main housing (A) between left and right
stands (D
1
,D
2
), and secure with six flange head
screws (HP2). See Figure 5.
Figure 5
7. Install funnel (B) beneath main housing. Secure
with funnel clamp (G). See Figure 6. Tighten
screw on funnel clamp securely.
Figure 6