3
2.0 Table of Contents
1.0 Warranty and Service ............................................................................................................................. 2
2.0 Table of Contents ................................................................................................................................... 3
3.0 IMPORTANT SAFETY INSTRUCTIONS ............................................................................................... 4
4.0 About this machine and manual ............................................................................................................. 5
5.0 J-CK350 Features .................................................................................................................................. 6
6.0 Specifications ......................................................................................................................................... 6
7.0 Features ................................................................................................................................................. 7
7.1 Miter Cutting Head .............................................................................................................................. 7
7.2 Miter Position Lock ............................................................................................................................. 7
7.3 Self-centering Vise ............................................................................................................................. 7
7.4 Blade Lock .......................................................................................................................................... 7
7.5 Controls .............................................................................................................................................. 7
7.6 Trigger Handle .................................................................................................................................... 7
7.7 Mist Coolant System .......................................................................................................................... 7
8.0 Installation .............................................................................................................................................. 8
8.1 Unpacking the Machine ...................................................................................................................... 8
8.2 Anchoring and Handling the Machine ................................................................................................ 8
9.0 Electrical Connections ............................................................................................................................ 8
10.0 Controls ................................................................................................................................................ 8
10.1 Control Panel .................................................................................................................................... 8
10.2 Trigger Handle .................................................................................................................................. 8
11.0 Operation ............................................................................................................................................. 9
11.1 General Operating Procedure .......................................................................................................... 9
11.2 Miter Adjustment............................................................................................................................... 9
11.3 Depth Stop ........................................................................................................................................ 9
12.0 Maintenance ....................................................................................................................................... 10
12.1 Maintenance Requirements ........................................................................................................... 10
12.2 Periodic Maintenance ..................................................................................................................... 10
12.3 Coolant System .............................................................................................................................. 10
12.4 Coolant ........................................................................................................................................... 10
12.5 Changing the Saw Blade ................................................................................................................ 10
12.6 Transmission Belts ......................................................................................................................... 10
12.7 Lubrication ...................................................................................................................................... 11
12.8 Air Prep Unit ................................................................................................................................... 11
12.9 Air Prep Unit ................................................................................................................................... 11
13.0 Blades ................................................................................................................................................ 12
14.0 Troubleshooting J-CK350 Cold Saw .................................................................................................. 14
14.1 Blade and Cutting Problems ........................................................................................................... 14
14.2 Machine Fault & Operating Problems ............................................................................................ 15
15.0 Parts ................................................................................................................................................... 15
Ordering Replacement Parts ................................................................................................................... 15
15.1.1 Stand Assembly – Parts List ....................................................................................................... 16
15.1.2 Stand Assembly – Exploded View ............................................................................................... 17
15.2.1 Head Assembly – Parts List ........................................................................................................ 18
15.2.2 Head Assembly – Exploded View ............................................................................................... 19
15.3.1 Base Assembly – Parts List ......................................................................................................... 20
15.3.2 Base Assembly – Exploded View ................................................................................................ 21
15.4.1 Manual Vise Assembly – Parts List ............................................................................................. 22
15.4.2 Manual Vise Assembly – Exploded View .................................................................................... 23
15.5.1 Guard Assembly – Parts List ....................................................................................................... 24
15.5.2 Guard Assembly – Exploded View .............................................................................................. 25
15.6.1 CK350 Mist Coolant Assembly – Parts List ................................................................................. 26
15.6.2 CK350 Mist Coolant Assembly – Exploded View ........................................................................ 27
15.7.1 In-Feed Table – Parts List and Exploded View ........................................................................... 28
15.8.1 Out-Feed Table Parts List and Exploded View ........................................................................... 29
15.9.1 Stock Stop Assembly – Parts List and Exploded View ............................................................... 30
16.0 Wiring Diagram .................................................................................................................................. 31
Содержание J-CK350-4
Страница 17: ...17 15 1 2 Stand Assembly Exploded View...
Страница 19: ...19 15 2 2 Head Assembly Exploded View...
Страница 21: ...21 15 3 2 Base Assembly Exploded View...
Страница 23: ...23 15 4 2 Manual Vise Assembly Exploded View...
Страница 25: ...25 15 5 2 Guard Assembly Exploded View...
Страница 27: ...27 15 6 2 CK350 Mist Coolant Assembly Exploded View...
Страница 31: ...31 16 0 Wiring Diagram...
Страница 32: ...32 427 New Sanford Road LaVergne Tennessee 37086 Phone 800 274 6848 www jettools com...