background image

 

 

10/25/2018 

643 SO. DUGGAN AVENUE • AZUSA, CALIFORNIA 91702-5185 
           (626) 969-

7991 • (661) 324-3378 • FAX (626) 969-4991

 

 
 
 
 
 
Installation: 

 

1.  Turn 

OFF

 all power to the pilot station. 

 
2.  Remove the relay in the pilot station. 
 
3. 

Remove the 30mm “GREEN” level sensor on the rainswitch. 

 
4.  Install the replacement probe, using the 30mm x 

½” MNPT adaptor. No 

sealing tape or compound is necessary as a watertight connection is not 
necessary. 

 

5.  Install the level controller in the pilot station if there is room. You may find 

it easier to install the controller in another enclosure and wire it to the 
existing pilot station as this controller is larger than the relay you have 
removed. 

 

 
6.  Wire the controller per the appropriate wiring schematic. 

Dwg# JICAT1PB2L-C for JIC-AT1PB2L-A Automatic Pilot Stations 

           Dwg# JIC1PB2L-C for JIC-1PB2L-A Manual Pilot Stations 

Continuity check all connections to confirm correct wiring prior to 
repowering the pilot station. 
 

7.  The drawings and manual are available for download from 

WWW.RAINSWITCH.COM

. 

 
 

 
 
Conclusion: 

 
 

You will now have a vastly improved operating rain diversion system, with 

far less maintenance problems.

 

Отзывы: