3.2 Precautions for installation
3.2.1 Make sure the four posts stand paralleled and are vertical to the ground. No slanting.
3.2.2 Joints of oil hose and steel cable must be firmly connected in order to avoid the looseness of steel cable and leakage of oil
hose.
3.2.3 All bolts should be firmly screwed up.
3.2.4 Do not place any vehicle on the lift in the case of trial running.
3.3 Installation instructions
Step1: Choose a proper site
Location requirement
If not specifically stated, our lifts are only for indoor use. It should be fixed on a smooth and solid concrete ground. Do not install
this lift on expansion beams of concrete or on a second or an elevated floor without first consulting building architect.
Make sure
that the space around or over the lift should be free of obstructions like heaters, building supports, electrical lines etc.
Step 2: Fix the installation layout.
Once the installation site is determined, mark first the standing point of the four posts by a tape measure and chalk. Ensure two
diagonal lines are of the same length.
Step 3: Remove the packing materials.
Step 4: Lay down the main post and assistant post as showed in below picture.
Step 5: Connect the main beam (the one without angle bar) into the posts and lock it on the second lock. Then put both posts up.
Please refer to below picture.
Step 6: Connect the other posts and beams in the same method.
Step 7: Position the four posts according to the dimensions show in the picture.
Содержание JA4000FP
Страница 18: ...18 7 Annex Annex1 Packing list of the whole lift Annex2 Overall diagram ...
Страница 19: ...19 Annex3 Floor plan ...
Страница 20: ...20 Annex 4 Steel cable connection ...
Страница 21: ...21 ...
Страница 22: ...22 ...
Страница 24: ...24 ...
Страница 25: ...25 ...