Installation, operation and parts manual
JA2000J
8
(Hydraulic pneumatic)
JA2000J-AIR: Connect the air hose (It is only necessary to jack with pneumatic hydraulic pump)
The end user need to prepare
¢
8mm air hose. Length of the hose is decided by practical use.
Connect one end of the hose to the air-in connector on the pump and the other end to the air supply equipments.
(Air pressure: 6~8kg/cm²)
Loosen the bleed valve before taking the jack in use. If the user does not do this, the hydraulic pump break and it will not be covered under
warranty.
3.4. Items to be checked after installation.
S/N
Check items
YES
NO
1
If the roll wheels of the jack could move easily in the track?
2
If the jack is slant?
3
If all the connections are firm and reliable
?
4
If it is grease as being required?
air-in connector
pneumatic pump
bleed valve
Содержание JA2000J
Страница 13: ...Installation operation and parts manual JA2000J 13 ANNEX Annex1 Overall dimension 1 JA2000J AIR ...
Страница 14: ...Installation operation and parts manual JA2000J 14 Annex2 Hydraulic system ...
Страница 15: ...Installation operation and parts manual JA2000J 15 Annex3 Separated drawings ...