GENOA FURLER
Put the genoa furling sheet on the drum.
Before sailing, hoist the genoa in a lull.
Secure the peak and halyard on the swivel-traveller, and the tack on the drum and sheets.
Insert the bolt-rope into the feeder. Hoist the halyard taut, but not as strongly as with a
sail on a normal stay. Pull the stopper from the cockpit to roll up the sail.
Never try to overcome a resistance when rolling up or spreading the sails: ensure that a
halyard is not jammed in the furler.
MAINTENANCE
- Regularly rinse the drum and swivel,
- Grease the bearings if advised by the manufacturer,
- For extended off-service periods, take down the sails.
33/87
4
indice 0
ENROULEUR DE GENOIS
Mettre en place la bosse d’enrouleur sur le tambour.
Il convient d'envoyer le génois avant l'appareillage, en profitant d'un moment sans vent.
Fixer le point de drisse et la drisse sur le curseur-émerillon, le point d'amure sur le tam-
bour et les écoutes; Hisser en engageant la ralingue dans l'engoujure; Raidir suffisamment
la drisse mais en étarquant moins fortement que si la voile était sur un étai normal. Rouler
la voile en tirant sur la bosse depuis le cockpit.
Dans tous les cas d'enroulage ou de déroulage des voiles d'avant, si vous sentez un point
dur, ne jamais forcer: vérifier qu'une drisse ne s'est pas prise dans l'enrouleur.
ENTRETIEN
- Rincer régulièrement le tambour et l'émerillon
- Graisser les roulements si le fabricant le recommande
- Dégréer les voiles en cas d'arrêt prolongé du bateau.
Содержание SUN FAST 32i
Страница 4: ......
Страница 5: ...G N RALIT S GARANTIE GENERAL POINTS WARRANTY 1 4 87 indice 0...
Страница 6: ......
Страница 8: ......
Страница 16: ......
Страница 17: ...S CURIT 5 3 5 5 5 6 iso 10240 SAFETY 2 13 87 indice 0...
Страница 24: ......
Страница 25: ...COQUE 5 3 5 4 5 5 iso 10240 HULL 3 20 87 indice 0...
Страница 30: ......
Страница 31: ...PONT 5 3 5 4 5 5 iso 10240 DECK 25 87 4 indice 0...
Страница 32: ...PLAN DE PONT DECK LAYOUT 5 3 1 iso 10240 26 87 4 indice 0...
Страница 41: ...GR EMENT ET VOILURE RIG AND SAILS 5 3 5 4 5 5 iso 10240 35 87 5 indice 0...
Страница 54: ......
Страница 55: ...EMM NAGEMENTS ACCOMODATIONS 5 3 5 4 5 5 iso 10240 6 48 87 indice 0...
Страница 56: ...EMM NAGEMENTS ACCOMODATIONS 5 3 1 iso 10240 49 87 6 indice 0...
Страница 60: ......
Страница 61: ...PLOMBERIE PLUMBING 5 3 5 5 5 6 iso 10240 7 53 87 indice 0...
Страница 71: ...CIRCUITS LECTRIQUES WIRING 5 3 5 4 5 5 5 6 iso 10240 8 63 87 indice 0...
Страница 75: ...MOTEUR ENGINE 5 3 5 4 5 5 5 6 iso 10240 9 67 87 indice 0...
Страница 83: ...MISE L EAU LAUNCHING 5 2 5 3 5 4 iso 10240 10 75 87 indice 0...
Страница 91: ...HIVERNAGE 5 3 5 4 5 5 iso 10240 LAYING UP AND WINTER PRECAUTIONS 11 83 87 indice 0...