26/58
GROUND TACKLE
As a rule, set the anchor in at least 3 times the depth of water.
- Have your boat pointed into the wind and without speed.
- Pay out the chain while moving back slowly.
- Secure the cablet on the mooring cleat.
STERN ANCHORING
Stern anchoring shall be performed with the engine declutched.
- Secure the required length of cablet on the mooring cleat.
- Pay out the anchor line slowly.
- Take care not to damage the propeller or the rudder.
MAINTENANCE
PRECAUTION
Before anchoring check the depth of water, the power of the current and the nature of
the sea bed.
RECOMMENDATION
Rinse the mooring line with fresh water after each trip.
Содержание MERRY FISHER 585
Страница 1: ...MERRY FISHER 585 OWNER S MANUAL SPORTS LOISIRS 084941 Index J...
Страница 2: ......
Страница 8: ......
Страница 9: ...5 58 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY SPECIFICATIONS YOUR BOAT 1...
Страница 14: ......
Страница 18: ......
Страница 20: ......
Страница 26: ......
Страница 27: ...23 58 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING LINES TOWING GROUND TACKLE MAINTENANCE OF THE DECK 4...
Страница 32: ......
Страница 33: ...29 58 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 5...
Страница 34: ...30 58 ACCOMMODATION...
Страница 36: ......
Страница 38: ......
Страница 39: ...35 58 5 3 5 4 5 5 5 6 ISO 10 240 ELECTRICAL CIRCUITS BATTERY SWITCH BATTERY OPERATION ELECTRONIC 6...
Страница 40: ...36 58 5 3 3 b 5 5 1 ISO 10 240 BATTERY SWITCH...
Страница 42: ......
Страница 44: ......
Страница 48: ...44 58 FUEL VALVE...
Страница 52: ......
Страница 53: ...49 58 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS 8...
Страница 54: ......
Страница 56: ......
Страница 57: ...53 58 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 9...
Страница 58: ......
Страница 60: ......
Страница 62: ......