25/58
NAVIGATION
MOORING LINES
A sufficient number of mooring lines suitably sized and suitable for the environment shall be
on board for mooring your boat.
- Always manoeuvre your boat using the engine.
- Make allowance for the current and wind when you handle your boat.
- Protect your boat to the highest degree with suitably sized fenders.
- Always keep the mooring ropes unfouled and stored away.
- Handle your boat at a reduced speed.
AFTER MOORING
- Protect the mooring lines against chafing with plastic sleeves.
- Make allowance for the variations in tides if need be.
TOWING
TOWING BOAT
- Tow another boat at a reduced speed and as smoothly as you can.
- Pay particular attention when you throw or catch the towing rope (it may foul on the
propeller).
Note: The stability may be reduced when you tow a boat.
TOWED BOAT
- Keep steering your boat and see to it that you stay in the wake of the towing boat.
- Inappropriate towing can damage your vessel, do not tow at more than 6 knots.
DANGER
Wear your life jacket.
In heavy weather, wear your safety harness and fasten yourself to the boat.
When sailing, close and lock the door or doors giving access to the transom extension
DANGER
Don't try to stop the boat with your foot, your hand or a boat hook.
4
DECK
Содержание MERRY FISHER 585
Страница 1: ...MERRY FISHER 585 OWNER S MANUAL SPORTS LOISIRS 084941 Index J...
Страница 2: ......
Страница 8: ......
Страница 9: ...5 58 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY SPECIFICATIONS YOUR BOAT 1...
Страница 14: ......
Страница 18: ......
Страница 20: ......
Страница 26: ......
Страница 27: ...23 58 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING LINES TOWING GROUND TACKLE MAINTENANCE OF THE DECK 4...
Страница 32: ......
Страница 33: ...29 58 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 5...
Страница 34: ...30 58 ACCOMMODATION...
Страница 36: ......
Страница 38: ......
Страница 39: ...35 58 5 3 5 4 5 5 5 6 ISO 10 240 ELECTRICAL CIRCUITS BATTERY SWITCH BATTERY OPERATION ELECTRONIC 6...
Страница 40: ...36 58 5 3 3 b 5 5 1 ISO 10 240 BATTERY SWITCH...
Страница 42: ......
Страница 44: ......
Страница 48: ...44 58 FUEL VALVE...
Страница 52: ......
Страница 53: ...49 58 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS 8...
Страница 54: ......
Страница 56: ......
Страница 57: ...53 58 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 9...
Страница 58: ......
Страница 60: ......
Страница 62: ......