27/88
INSTRUCTIONS TO REPAIR THE GEL COAT
MIXING RATIO
Our products contain an accelerator, you just have to add the catalyst (a colourless liquid). The usual
ratio is 2 %.
The gel setting time (working time) is about 1/2 h, curing takes about 10 h.
APPLICATION
- To fill up a blister hole or a scratch, sand and clean the area with acetone.
- Prepare the necessary amount of gel coat, preferably on a glass plate.
- Apply the product with a spatula or a point and the layer shall be thick enough to make possible a
further sanding.
- In order to blend minor touching up on smooth surfaces, stick sellotape (or even better, a mylar
tape) on the freshly applied gel coat.
- Remove sellotape after curing.
- To get a highly shiny finish, sand with extra fine abrasive and water then polish.
STORAGE
To keep them properly, store the gel coat components in a cool dry and dark place.
Keep the components 6 months maximum.
Polyester products are flammable ; take the usual precautions.
CLEANING YOUR TOOLS
Clean all your tools with acetone.
WARNING
Please respect the following conditions to repair successfully:
- Dry weather.
- Temperature between 15° C and 25° C.
DANGER
The catalyst is a dangerous product:
- Keep it out of the reach of children.
- Avoid contact with skin and mucous membranes.
- In case of contact wash with soapy water and rinse thoroughly.
3
HULL
Содержание LOISIRS
Страница 1: ...PRESTIGE 30 OWNER S MANUAL SPORTS LOISIRS...
Страница 2: ......
Страница 8: ......
Страница 9: ...5 88 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY YOUR BOAT TERMS AND CONDITIONS OF WARRANTY 1...
Страница 16: ......
Страница 18: ...14 88 5 3 3 d ISO 10 240 POSITION OF THE LIFERAFT...
Страница 26: ......
Страница 28: ......
Страница 32: ......
Страница 33: ...29 88 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING TOWING ANCHORING RADAR MAINTENANCE OF THE DECK 4...
Страница 34: ...30 88 5 3 1 ISO 10 240 DECK LAYOUT A Mooring cleats B Towing C Swimming ladder...
Страница 40: ......
Страница 41: ...37 88 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 5...
Страница 42: ...38 88 ACCOMMODATIONS...
Страница 46: ......
Страница 50: ...46 88 5 3 3 a 5 3 3 g ISO 10 240 THRU HULL FITTING Thru hull fitting closed Thru hull fitting open...
Страница 52: ...48 88 5 3 3 a 5 3 3 d 5 3 3 g 5 3 3 k ISO 10 240 WASHROOM TO PORT 1 Drainage Washbasin 2 Shower tray draining...
Страница 56: ......
Страница 58: ......
Страница 62: ......
Страница 64: ...60 88 ELECTRIC JUNCTION PANEL Access to the control panel connections Access by trapdoor in aft cabin...
Страница 66: ...62 88 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER SOCKET Breaker Shore power socket...
Страница 68: ...64 88 LEAD LINES 1 Depth sounder 2 Log and speedometer Access through trapdoor in side cabin...
Страница 70: ...66 88 STEERING 1 Steering wheel 2 Steering rack bell cover 3 Steering rack 4 Steering cable Access by aft chest...
Страница 72: ......
Страница 74: ...70 88 CLOSING VALVE OF THE FUEL SYSTEM...
Страница 76: ...72 88 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 Fuel filter...
Страница 78: ......
Страница 82: ......
Страница 83: ...79 88 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS 9...
Страница 86: ......
Страница 87: ...83 88 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 10...
Страница 88: ......
Страница 90: ......
Страница 92: ......