JDS Uniphase IP Video Test Option HST-3000 Скачать руководство пользователя страница 2

 

 

Repeat steps 1-5 (and possibly 8 and 7) until the fiber appears clean.  If you repeat this 
procedure three times and the fiber still appears dirty, throw out the fiber as it is likely 
scratched.   

 

2  Setup for Testing an Optical Link with the HST-3000 

This section describes setup and testing when the location in the field is an optical drop.   

Step 

Directions 

 

The first step is turning the unit on and then 

hitting the 

home key

.  Then select the 

Eth 

Optical

 tab and select option 1 

1G Terminate

.  

 

 

 

The unit will now boot up.  Make sure to insert the proper SFP into the R/T 1 slot (top 

left of the unit).  The proper SFP will be either a 1310nm or 850nm optical SFP 
depending on the handoff.  

 

The next step is to select Layer 2 Traffic as your 

Test

 selection. 

 

Now press the 

configure

 button on the tester.  

Then select 

RFC 2544 Mode = Disable

 and 

Auto Negotiation

 and depending on the network 

select 

On

 or Off (most likely this will be set to 

on).  Next press the 

home

 key. 

 

Now select the 

Action

 tab and then select 

Laser 

On

 

You should see the screen turn green.  If not, 

select the 

display

 key and then select the 

summary 

result pane.  Then select the 

restart

 

key on the right side.   

 

Содержание IP Video Test Option HST-3000

Страница 1: ...lts key to display the results of the scope image 4 Turn the focus control on the probe to focus the image on the display 5 There should not be any dirt on the image If there is dirt clean the fiber a...

Страница 2: ...erminate 2 The unit will now boot up Make sure to insert the proper SFP into the R T 1 slot top left of the unit The proper SFP will be either a 1310nm or 850nm optical SFP depending on the handoff 3...

Страница 3: ...se do so at this time 2 Press the configure button Tap the left and right arrows until you get to the Summary Settings Screen Then Select Loop Type Broadcast Tx Payload Acterna Frame Length Random Enc...

Страница 4: ...ct 2 Loop and then Select 1 Loop Up 8 You should see a message at the top stating Remote Loop Up Successful If you do not see this message please double check your settings If the message still does n...

Страница 5: ...describes how to validate the link between two locations The output of this test is a go or no go on the quality of the link and the results can be saved for further analysis This section is expected...

Страница 6: ...will change at each location but should be the CIR for the circuit 5 Tap right to select the Frame Length Tab Make sure that The smallest possible Frame Length is selected this will be either 64 68 70...

Страница 7: ...9 Tap right to select the Frame Loss Make sure that Test Procedure RFC 2544 Trial Dur 60 sec Test Granularity 10 Mbps 10 Next press the home key Then select Restart 11 Now select the Action key and t...

Страница 8: ...rn on the HST 3000 3 Press the System Navigation key and press the TOOLS soft key Press the Up Arrow or Down Arrow key to select File Manager then press the OK key to manage user files in the file sys...

Отзывы: