Chapter 5
FT1 Test Commands
Description of FT1 test commands
54
CT-650 Command-Line Reference Guide
Release 9.4
Description of FT1 test commands
This section describes the FT1 commands.
DI_Monitor
Starts a new test to monitor and drop FT1 channels.
Syntax
DI_Monitor <
<
> <
Remark
The default framing format configured for the RTU must match the
digroup framing format.
FT1_DI_Measure
Starts an intrusive drop and insert test.
Syntax
FT1_DI_Measure <
> <
>
<
> <
>
Remarks
– This command is available only after executing a
FT1
_
DI_Split
.
– Not all
test_pattern_types
require a
test_pattern
param-
eter.
FT1_DI_Split
Establishes an EF split using the desired signal flow.
Syntax
FT1_DI_Split <
Remark
This command is available only after executing a
DI_Monitor
.
Содержание CT-650
Страница 1: ...CT 650 Wideband Test Unit Release 9 4 Command Line Reference Guide ...
Страница 2: ......
Страница 3: ...CT 650 Wideband Test Unit Release 9 4 Command Line Reference Guide ...
Страница 4: ......
Страница 22: ...Contents xxii CT 650 Command Line Reference Guide Release 9 4 ...
Страница 104: ...Chapter 7 DS0 VF Test Commands Description of VF test commands 78 CT 650 Command Line Reference Guide Release 9 4 ...
Страница 108: ...Chapter 8 Batch Files Unavailable commands for batch files 82 CT 650 Command Line Reference Guide Release 9 4 ...
Страница 198: ...Appendix A Test Results Definitions Loopback status information 172 CT 650 Command Line Reference Guide Release 9 4 ...
Страница 240: ...Appendix D Customer Services and Support Training options 214 CT 650 User s Guide Release 9 3 ...
Страница 247: ......