P/N 960-100929R_Rev. 3 {EDP #148849}
© 2012, Japan CashMachine Co., Limited
6 - 9
Calibration and Testing
iVIZION® SeriesNext-Generation Banknote Acceptor Unit
Section 6
Once the four (4) Sensors Calibration Procedures
are complete, the “
Calibration Information
”
Screen shown in Figure 6-43 will re-appear.
13. Remove the Cash Box and remove the piece of
Calibration Cardboard, then reseat the Cash Box
into the iVIZION
®
Device again.
14. Place Reference Paper KS-072 into the
iVIZION
®
Device (See “Placing the KS-072
Reference Paper” on page 6-7 of this Section).
15. Mouse-click on the “
OK
” Screen Button
(See Figure 6-43 a) to begin the following two
(2) UV Sensor Calibration Procedures:
a). Lower UV Sensor
b). Upper UV Sensor.
Calibration will be performed in the above alpha-
betic order while “
UV
RUNNING
” is showing on
Once the UV Sensor Calibration is complete, the
“
Calibration Information
” Screen shown in Fig-
ure 6-45 will re-appear.
16. Remove the KS-072 Reference Paper and
Mouse-click on the “
OK
” Screen Button
(See Figure 6-45 a) to begin the UV Sensor
Non-Paper Calibration.
Once the UV Sensor Non-Paper Calibration is
complete, the “
Calibration Information
” Screen
shown in Figure 6-46 will re-appear.
17. Place the KS-072 Reference Paper back into the
iVIZION
®
Device (See “Placing the KS-072
Reference Paper” on page 6-7 of this Section).
18. Mouse-click on the “
OK
” Screen Button
(See Figure 6-46 a) to begin the following three
(3) CIS Sensor Calibration Procedures:
a). CIS Transmissive Sensor
b). CIS Upper Sensor
c). CIS Lower Sensor.
Calibration will be performed in the above alpha-
betic order while “
CIS
RUNNING
” is showing on
Once the CIS Sensor Calibration is complete, the
“
Calibration Information
” Screen shown in Fig-
ure 6-48 will re-appear.
19. Remove the KS-072 Reference Paper and
Mouse-click on the “
OK
” Screen Button
(See Figure 6-48 a) to begin the CIS Sensor
Non-Paper Calibration Procedure.
Once the CIS Sensor Non-Paper Calibration Pro-
cedure is complete, the Calibration Value will be
written to the EEPROMs located on the Sensor
Board and the CPU Board (See Figure 6-49).
Figure 6-42
Exit Calibration Proceeding Screen
NOTE: The Barograph does not indicate a Calibration in progress.
Figure 6-43
Calibration Information Screen 3
a
Figure 6-44
UV Calibration Proceeding Screen
NOTE: The Barograph does not indicate a Calibration in progress.
Figure 6-45
Calibration Information Screen 4
a
Figure 6-46
Calibration Information Screen 5
a
Figure 6-47
CIS Calibration Proceeding Screen
NOTE: The Barograph does not indicate a Calibration in progress.
Figure 6-48
Calibration Information Screen 6
a