background image

JC MACHINERY & TOOLS INC.                 

                        Quality We Trust 

__________________________________________________________________

www.jc-tool.com                                                                        [email protected] 

v.

 

Welding Process 

1. 

Setting  temperature  according  to  the  data  of  welding  test  (rotate  temperature 

adjust knob (12)). 

2. 

Setting speed according to the data of welding test (rotate walking speed adjust 

knob (8)). 

3. 

Turn on blower ON/OFF switch (11). 

4. 

Put the hot air nozzle into the middle of upper film and down film (as shown the 
below picture) when the hot air blower reaches the setting data. 

5. 

Press  down  handle  (6). 

6. 

Turn  on  walking  switch  (9). 

7. 

To  observe  the  relative  position  of  the  edges  of  pressure  roller  (2)  and  up
per  film.   

8. 

When the welder walks into the end of material, pull up the machine a little, and 
move out of the hot air nozzle from welding place. 

9. 

Turn off the walking switch (9). 

10. 

Turn off blower ON/OFF switch (11) after cool down hot air blower. 

vi.

 

Routine Maintenance 

Use steel brush to clean the hot air nozzle 
Clean the air inlet at the back of the hot air blower 

 
 
 

Отзывы: