NOTf::: Before digging, call to loc<1tc any buried utility lines.
NOT!: 1\t rirn hciuht 10' . distance f
r
om the face of backboard to the
f
r
ont of i\foin Po::-t(A) is 4 ., , Choose the proper location to dig
fiJr the corn.::rt'tc rooting:
C STEP A
a. Dig a hole 48" deep and 21"x 21"square. The edge of the hole
should be flush with the ed9e of the playing surface. If you live in an area
where heavy frost can occur. it may pose a problem, consult your local
building inspector to determine the appropriate hole depth.
NOTE: The hole must be at !cast 48" deep.
b. Build a form before pouring the concrete pad, to ensure that the top
of the concrete remains straight and square. The form should
be placed about 1/2" above the playing surface to allow for water drainage.
c. Bell out the bottom of the hole.
NOTE: i\ i-qunrc liolc prevents thi: rotation of the concrete.
NOTE: The ;trca behind the playing surface must be ck<1red o f
f
by at least
::; f"ect w cnabk tht.: user to :--tand behind the pole to adjust the Rim height.
( STEP B
A. Thread a 18mm Hex Nut (U4) onto each of the 18mm J-Bolts
(U2).Securely lighten the Nuts all the way down to the end of the
threads.
B. Slide tho thi-eaded end of the J�Bolts through the holes
4
in the Anchor Template (U·I) and secure each J-Bolt with a
18mm J-Bolt Hex Nuts(U4) as shown. Securely tighten all Nuts
at this time.
NUIT: i\fokc sure the curved " J ' ' ends of the J-Bolts arc
oriented in a rectangular pattern. as shown.
U 4 ,
),
/
·•··
/ b
(
U2 / P
/ _ , /
/ /
/ / / "
/:/
. . -
U2
U2
..--:::::::=:: .. �
U2