www.javad.com
JNSGyro-4T Operator’s Manual
2-5
C O N F I G U R A T I O N
Connecting the JNSGyro-4T and a Computer
flow control (if applicable) – display in the lower-left corner of the main
window of PCView. A timer begins to count up in the lower-right corner as
well (Figure 2-4).
Figure 2-4. PCView Connection Established
Содержание JNSGyro-4T
Страница 2: ......
Страница 8: ...vi JNSGyro 4T Operator s Manual www javad com Notes ...
Страница 12: ...x JNSGyro 4T Operator s Manual www javad com Notes ...
Страница 48: ...2 18 JNSGyro 4T Operator s Manual www javad com Notes ...
Страница 58: ...3 10 JNSGyro 4T Operator s Manual www javad com Notes ...
Страница 102: ...A 12 JNSGyro 4T Operator s Manual www javad com Notes ...
Страница 112: ...B 10 JNSGyro 4T Operator s Manual www javad com Notes ...
Страница 116: ...D 2 JNSGyro 4T Operator s Manual www javad com Notes D ...