JASON Hydrotherapy KT525 SR Скачать руководство пользователя страница 16

© 2021 Jason® Hydrotherapy  • 501.771.4477

Page 16 of 28

Customer Service :  800.255.5766

INSTALLATION INSTRUCTIONS (cont.)

6. Integral Tile Lip Alcove Installation

After the bath has been leveled, confirm the height mea

-

surement of the underside of the flange deck in order to 

install a 1”x2” ledger strip to support the tile lip flange (see 

Figure 4

).

   Figure 

4

Install the 1” x 2” support ledger strip to the framing to 

allow support along the entire rear ledge of the bath (see 

Figures 2 and 5

).

  

 

 

Figure 5

Carefully drill 1/8” holes through the tile flange at each stud 

location.  

NOTE:

 Be sure not to drill the hole at an angle as this 

can cause negative draft on the flange and result in water 

pooling on the deck.  

Secure the flange to the stud with screws making sure the 

screws are installed parallel to the bath to avoid negative 

draft. 
 

WARNING: To prevent damaging the acrylic, be careful 

not to over-tighten the screws.

7. Tile Flange

100% Silicone with mildew resistant properties should be 

applied between the water resistant backer board and the 

deck of the deck.

Note:

 If you use a tile flange kit, modify the framing to 

support the bath lip as shown in 

Figure 6.

   Figure 

6

8. Secure Equipment Mounts

Once the bath is positioned in the area of intended installa-

tion, cut the equipment support strap(s) to allow the equip

-

ment to rest firmly, level with the bottom of the bath, on the 

floor.  We recommend securing the equipment mounts to 

the floor with removable fasteners for ease of servicing.

9. Acrylic Bath Surface

The acrylic surface of this bath has been provided with a 

protective film which helps protect the bath during ship

-

ment and installation.  If the bath is tiled in, remove the 

necessary portion of the film when installing the tile.

Additional protection may also be required to protect the 

acrylic surface during installation. Protect the acrylic bath 

surface from damage during installation with a suitable 

material, i.e. cardboard and/or plastic film.  

10. Cleaning

Remove all loose debris.  Construction plaster or excess 

grout can be removed with the use of a wood (edge) 

trowel.  Paint or tar stains may need to be removed with 

a cleaner such as paint thinner, turpentine or rubbing al-

cohol.  Never allow the cleaner to soak against the acrylic 

surface for long periods of time. 

Always rinse the surface 

immediately following the use of cleaners.

11. Water Testing

Before finishing the installation, it is recommended that the 

bath be water tested and any plumbing tested for leaks.

Height for

Ledger Support

   1" X 2"

SUPPORT

SCREW

SILICONE BEAD

TILE

DRYWALL

DRYWALL

TILE

  OPTIONAL

TILE FLANGE

        KIT  

   1" X 2"

SUPPORT

SCREW

TILE

FLANGE

BATH LIP

SUPPORT

Содержание KT525 SR

Страница 1: ...romptly The installer is responsible for insuring that the unit is free from defects or shipping damage In the event of a problem DO NOT install the unit Jason Hydrotherapy is not responsible for dama...

Страница 2: ...2021 Jason Hydrotherapy 501 771 4477 Page 2 of 28 Customer Service 800 255 5766 NOTES...

Страница 3: ...timulants antihistamines vasoconstric tors vasodilators hypnotics narcotics or tranquilizers F Lower water temperatures are recommended for extended use exceeding 10 15 minutes and for young children...

Страница 4: ...es et pour les jeunes enfants F Puisque les temp ratures excessives ont un potentiel lev pour les f tus durant les premiers mois de la grossesse les femmes enceintes ou possiblement enceintes doivent...

Страница 5: ...cant DANGER Ne pas modifier le c blage install en usine Tous les mat riaux de construction et c blage doivent tre loi gn s de toutes sources de chaleur moduites par le abin ATTENTION Garder les cheveu...

Страница 6: ...Trouble Shooting Guide section of this manual If the unit still fails to operate and is out of warranty contact an authorized service technician for repair If the unit is within the warranty period co...

Страница 7: ...ature sensors and Jason s Bluetooth Sound Immersion system WHIRLPOOL FEATURES Jason s Whirlpool hydrotherapy bath utilizes Perfect Pressure Perfect Flow jets that are directed at key muscle groups all...

Страница 8: ...ONS cont STANDARD EDITION ELECTRONIC CONTROLS ICONS POWER Icon WHIRLPOOL Icon WP MW AW AIRMASSEUR Icon AM MA AW MICROSILK Icon MS MW MA LED Icon Optional PILLOW Icon Optional WP MW AW Blower SPEED Ico...

Страница 9: ...een all the colors A single press of the icon will progress the light to the next mode or color Press and hold the icon to cycle through the FADE mode release the icon to choose any custom color Order...

Страница 10: ...solid GREEN This purge cycle can be canceled by pressing and holding the power button for five 5 seconds Starting the AirMasseur will turn OFF any other therapy equipment running at that time MicroSi...

Страница 11: ...t in timer shuts off the therapy equipment twenty 20 minutes after being activated Customized User Settings Menu The Signature Edition system offers many features that can be customized through the Se...

Страница 12: ...the six 6 buttons will begin to light Press the illuminated button to proceed to the next icon The LED light will be tested next Select the check mark to verify the appropriate Red Green or Blue color...

Страница 13: ...can be canceled by selecting the CANCEL button Starting the AirMasseur will turn OFF any other therapy equipment running at that time The PILLOW icon is used to activate the neck jets when the Jetted...

Страница 14: ...h thoroughly after cleaning SURFACE MAINTENANCE Area with minor scratches or dull surfaces can be restored by applying commercially available plastic polish i e No vus Plastic Polish No 2 available at...

Страница 15: ...aining To verify use a level on top of the deck on both ends and front of the bath Jason baths are designed to be support ed at the base of the bath If the floor is smooth and level the bath s Level F...

Страница 16: ...the area of intended installa tion cut the equipment support strap s to allow the equip ment to rest firmly level with the bottom of the bath on the floor We recommend securing the equipment mounts t...

Страница 17: ...air inlet of the bath Choose a loca tion as close as possible to the bath to ensure maximum efficiency 1 The installer must determine the layout of the piping exact remote mount location and service...

Страница 18: ...and exposed metal in the area as may be required by local code Note The air blower s exterior housing is made of all plastic ma terials and does not require a bonding conductor Grounding is required...

Страница 19: ...ICL 297 Female Nema Load Connections Not Used Ozone Male Nema Line Connection Keypad IDU 264 LED Cable CBL 366 LED Cable CBL 366 Keypad Cable CBL 372 WP Pump Male Nema Line Connection To Dedicated 120...

Страница 20: ...Bluetooth Sound Immersion Included on Signature Edition AIRMASSEUR AM SYSTEM Notes Asinglededicated120v 60hz20AGFCI protected service is required for all bath equipment Additional options may require...

Страница 21: ...372 WP Pump To Dedicated 120V 60Hz 20A GFCI Protected Service LWL Temp Sensor ITW 209 1 2 Male Nema Line Connection Blower Male Nema Line Connection To Dedicated 120V 60Hz 20A GFCI Protected Service...

Страница 22: ...ted120v 60hz20AGFCI protected service is required for all bath equipment Additional options may require multi ple outlets be installed on the single service Optional Thermo Comfort Surface Heater Heat...

Страница 23: ...L Temp Sensor ITW 209 1 2 Male Nema Line Connection Male Nema Line Connection To Dedicated 120V 60Hz 20A GFCI Protected Service Heater MS Pump TRANSDUCER BLACK RED BLACK RED BLUETOOTH AMPLIFIER Option...

Страница 24: ...Male Nema Line Connection Light ASW Display ICL Light Water Detect Power LED Config Switch Load 2 Load 1 LEDs ICL 297 Female Nema Load Connections Ozone Male Nema Line Connection Keypad IDU 264 LED C...

Страница 25: ...2021 Jason Hydrotherapy 501 771 4477 Page 25 of 28 Customer Service 800 255 5766 NOTES...

Страница 26: ...ers and GFCI if tripped Check fuses and replace if bad Check voltage at motor when control is on If no voltage control is defective b Make sure plug is fully inserted into the control box outlet c Che...

Страница 27: ...er recently using the bathtub and its equipment b Purge cycle has started with no apparent warning a No action is needed This is a normal feature to help keep the air channel dry and sanitary b Follow...

Страница 28: ...e free from defects in workmanship and materials as provided in the enclosed Warranty Statement and Warranty validation card The pre addressed warranty registration card MUST be filled out by the purc...

Отзывы: