background image

Jason International, Inc.  •  

 

501.771.4477  

 

 

 

Page 2 of 9

  

 

 

             

Customer Service :  800.255.5766 

Jason International, Inc.  •  

 

501.771.4477  

 

 

 

Page 3 of 9

  

 

 

             

Customer Service :  800.255.5766 

Copyright © 2011 Jason International.

InsTallaTIOn

each bath is provided with a cardboard bath well protector 
that should be kept in the unit during the installation and 
throughout the bathroom construction process.  

Overflow 

drains, fill spouts, and valves must be installed according to 
the instructions herein.

See the USeR MAINTeNANCe INSTRUCTIONS section 
of this owner’s manual, prior to Installation, for humidity 
and mold prevention suggestions.

Finish Frame 

1. 

A finish frame under the shell rim should also 

always be constructed to support the bath deck and insure 
proper drainage toward the bath well. This frame is not 
intended to support the full bath weight

 (see Figures 1 & 2). 

 

Figure 3

Jason  offers  a  removable  lateral  skirt  for  most  baths. 
The  skirts  are  available  in  matching  acrylic  colors  and 
provide  convenient  access  to  bath  equipment  as  well 
as  an  excellent  finished  appearance.  However,  if  Ja-
son’s  lateral  skirt  is  not  used,  an  access  panel  MUST 
be  provided  to  enable  final  electrical  connections  and 
service.  Please  refer  to  the  minimum  recommended 
access  panel  size  in

  Table  1  -  Specifications. 

 

If a Jason lateral skirt is to be used, the bath deck must 
be leveled at 20.5” (52cm) from the support floor or the 
skirt will not fit properly.

100%  Silicone  with  mildew  resistant  properties  should 

2. 

be applied between the water resistant backer board and 
the deck of the bath. 

NOTe: If you use a tile flange kit, 

modify the framing to support the bath lip as shown 
in Figure 1.

A minimum ventilation opening of 2” x 4” (5 x 10 cm) for 

3. 

the blower is required, and should be designed to draw in 
indoor ambient air at a minimum of 22°C (72°F).

Install the drain and overflow assembly to the bath shell 

4. 

according to the instructions provided with the drain and 
position the bath in the area of intended installation.

Finish plumbing rough-in of drain and overflow assembly. 

5. 

At this time, considerations should be made for the posi-
tion and mounting of the faucet set, as well as all related 
plumbing. 

Remove  the  packing  board  before  installing 

6. 

the  bath. 

The  bath  is  equipped  with  separate  bath 

equipment  support  bases  which  are  joined  for  ship-
ment  with  packing  boards.  Detach  the  packing  board 
from  the  bath  and  from  underneath  the  equipment.

 

 
WARNING: ANy MODIFICATION TO The eqUIpMeNT 
IS NOT ReCOMMeNDeD AND WIll vOID The MANU-
FACTUReR’S WARRANTy.

Install the bath level for proper drainage. 

7. 

Jason baths 

are designed to be supported at the base of the bath. If the 
floor is smooth and level, the baths’ Level Form™ Base will 
provide proper drainage and support 

(See Figure 3).

Overflow

G RO UND - G REEN W IRE

NEUTRAL - W HITE W IRE

HO T - BLACK W IRE

 DEDICATED

120V, 60 Hz

G FCI PRO TECTED

  SERVICE

AIR  S WITCH 

CONTR OL BOX

AIR SW ITCH

"DRO P LO O P"

FULL SUPPO RT BASE

AIR SW ITCH ACTUATO R

Figure2

Figure 1

InsTallaTIOn InsTruCTIOns (cont.)

SILICO NE BEAD

TILE

DRYW ALL

DRYW ALL

TILE

  O PTIO NAL

TILE FLANG E

        KIT  

  O PTIO NAL

INTEG RATED

    TILE LIP

   1" X 2"

SUPPO RT

FIG . 2

SCREW

Содержание Integrity A6060

Страница 1: ...factory are the buyer s responsibility Damage sustained in transit is the responsibility of the carrier If damage is discovered If the carton shows sign of damage inspect the product before accepting...

Страница 2: ...x 91 x 52 148 91 x 43 cm 217 72 x 36 x 20 5 45 36 x 17 in 44 8 183 x 91 x 52 170 91 x 43 cm 219 72 x 36 x 20 5 45 46 1 183 x 91 x 52 170 225 60 x 42 x 20 5 44 36 x 17 in 45 4 152 x 107 x 52 167 91 x...

Страница 3: ...ant backer board and the deck of the bath NOTE If you use a tile flange kit modify the framing to support the bath lip as shown in Figure 1 A minimum ventilation opening of 2 x 4 5 x 10 cm for 3 the b...

Страница 4: ...lve and the elbow by removing the two 2 screws in the elbow Omit this step on baths where the blower is not factory installed and remote mounting is required Installtheblowerintheremotelocation Therem...

Страница 5: ...althofMassachusetts installation is to be done by a Massachusetts licensed plumber CLEANING Remove all loose debris 3 Construction plaster or excess grout can be removed with the use of a wood edge tr...

Страница 6: ...e whether used as an AirMasseur or a soaking bath Blower TheJasonIntegrityTM AirMasseur systemcontainsavariable speed controlled heated air blower The blower provided is factory tested when assembled...

Страница 7: ...ial number proof of purchase andmodelnumber Thiswillinsureaquickresponse on warranty items The serial number can be found on the front page of this manual or on the small card adhered to the back of t...

Страница 8: ...uch other manufacturer or supplier To obtain warranty service you must contact the retailer from which the merchandise was purchased or Company s distributor in your area Written notice of warranty de...

Страница 9: ...asoconstrictors vasodilators hypnotics narcotics or tranquilizers F Persons with a medical history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a...

Отзывы: