Jason International, Inc. •
501.771.4477
Page 4 of 16
Customer Service : 800.255.5766
Copyright © 2014 Jason International
4. Clamp the MicroSilk
®
Jet Line to the MicroSilk
®
Discharge Barb using the clamp provided on the tubing.
Assure the MicroSilk
®
Jet Line will allow proper drainage
to the Jets
(Figure 6)
. The discharge hose must have a
continuous drop from the discharge barb to the jet fitting.
5. Clamp the MicroSilk
®
Suction Line to the MicroSilk
®
Suction Barb using the clamp provided on the tubing.
Assure the MicroSilk
®
Suction Line will allow proper
drainage to the suction
(Figure 7)
. The suction hose
must have a continuous drop from the suction barb to the
suction fitting.
INSTALLATION INSTRUCTIONS (cont.)
6. Clamp the MicroSilk
®
Drain Line to the MicroSilk
®
Drain
Barb using the clamp provided on the tubing. Assure the
MicroSilk
®
Drain Line will allow proper drainage to the drain
fitting
(Figure 7)
. The drain hose must have a continuous
drop from the drain barb to the drain fitting.
Caution: Confirm all tubing is fully engaged on
its respective barb and its clamp has secured the
tubing to the barb.
7. The bottom of the Pump Mount must be secured and level
with the bottom of the bath, it is recommended removable
fasteners be used in case any future servicing is required.
8. Continue bath installation per the Jason Owner’s Manual
Installation, Operation, and Maintenance guide.
Figure 6
Figure 7