![Japan Radio Co. WIPAS2 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/japan-radio-co/wipas2/wipas2_instruction-manual_3344162020.webp)
1-2
3.1.6.
Power supply ............................................................................................... 3-21
3.1.7.
Terminals...................................................................................................... 3-22
3.1.7.1.
WT ........................................................................................................ 3-22
4.
Management Tool (MT)............................................................................................... 4-24
4.1.1.1.
MT
system requirements ..................................................................... 4-25
5.
INSTALLING A POINT-TO-POINT SYSTEM.............................................................. 5-26
5.1.
Overview and installation flow................................................................................ 5-26
5.2.
Start the Maintenance Tool..................................................................................... 5-28
5.3.
Configure the WT (master)..................................................................................... 5-29
5.4.
Configure the WT (slave) ....................................................................................... 5-33
5.5.
Installing the WT..................................................................................................... 5-35
5.5.1.
Installing the WT (master/slave) .................................................................. 5-35
5.5.2.
Setting the WT for Vertical or Horizontal Polarization ................................. 5-37
5.6.
Installing the WT (External Antenna Type)............................................................. 5-38
5.6.1.
Installing
Φ
30cm Antenna in WT (External Antenna Type) ......................... 5-38
5.6.2.
Installing
Φ
60cm
Antenna in WT (External Antenna Type) ........................ 5-43
5.7.
Adjusting the antenna Direction of the WT ............................................................ 5-48
5.7.1.
Adjusting the Antenna Direction of the WT ................................................. 5-48
5.7.1.1.
Measuring the receive level.................................................................. 5-49
5.7.1.2.
Roughly Adjusting the Direction ........................................................... 5-53
5.7.1.3.
Roughly Adjusting the Direction
(Using the Antenna direction adjustment
tool
)
5-54
5.7.1.4.
Finely Adjusting the Direction ............................................................... 5-55
5.7.2.
The receive level and the distance .............................................................. 5-57
5.8.
Installing the PoE PSE
(master/slave) .................................................................. 5-63
5.9.
Connecting Cables to the WT (master/slave) ........................................................ 5-64
5.10.
Waterproofing WT Small lid.................................................................................... 5-66
5.11.
When you use the cable with the LAP sheath for outdoor..................................... 5-69
5.12.
Testing .................................................................................................................... 5-72
5.12.1.
Ping test................................................................................................ 5-72
5.12.2.
Measure the Received Blocks Discarded Rate.................................... 5-73
5.13.
Check sheet............................................................................................................ 5-74
6.
Standard Tools for installation..................................................................................... 6-75
7.
INITIAL VALUES......................................................................................................... 7-76
7.1.1.
Initial values for WT(Master) parameters (Point to point System) .............. 7-76
7.1.2.
Initial values for WT (Slave) parameters (Point to point System) ............... 7-81
8.
Revision History.......................................................................................................... 8-82
Содержание WIPAS2
Страница 1: ...0 WIPAS2 INSTRUCTION MANUAL Point to Point Rev 1 3 20 Apr 2012...
Страница 21: ...1 3 9 Others 9 82...
Страница 30: ...2 12 2 2 External Views of the Units 2 2 1 WT in mm Figure 2 1 External View of the WT a 52...
Страница 31: ...2 13 2 2 1 1 WT Nameplate Nameplate a Nameplate b Figure 2 2 Nameplate...
Страница 35: ...2 17 2 2 2 WT External Antenna Type Figure 2 6 External View of the WT External Antenna Type...
Страница 36: ...2 18 2 2 2 1 WT External Antenna Type Nameplate Nameplate a Figure 2 7 Nameplate...
Страница 49: ...5 31...
Страница 69: ...5 51 Figure 5 33 Measuring the Receive Level Master...
Страница 70: ...5 52 Figure 5 34 Measuring the Receive Level Slave...
Страница 89: ...5 71 Figure 5 53 1 2...
Страница 101: ...9 83 WIPAS2 Instruction Manual H 7YZCM5107B Rev 1 3 20 Apr 2012...