background image

Prophi

®

 6R

6

2.1  Current  measurement

When  installing  the  current  converter,  care  should  be  taken  to  ensure  that  the  load 

current flows through it. The outputs of the compensation network must be installed 

behind the current converter (in the direction of current flow). If the device is connected 

up via  sum-current converters, the overall conversion ratio is entered.

 

2.2   Programming of phase-correction -  e.g. connection directly L-L  (400V)

Adjustment of phase-correction between voltage and current in the meas. system is done 

in expert mode 1  (page 17)

Example :

Meas.current: L1

Meas. Voltage L3-L2

Phase U/I [ 90°] 

- 6 -

L1 (R)
L2 (S)
L3 (T)
N

Meas.current

                                             

supply-

voltage

      Vb

 meas. -

voltage

  L2-L3

  k             l

T 2

A

T 2

A

PE

Ub

  Um

Im

(L)    (N)           L3          L2            k        l

  using

meas. current

meas. voltage

phase-angle

  Preset:

L1

L1 - N

    0°

L1

L1 - L2

  30°

L1 (k<->l)

L2 - N

  60°

  s. example

L1

L3 - L2

  90°

L1

L3 - N

120°

L1

L3 - L1

150°

L1 (k<->l)

L1 - N

180°

L1 (k<->l)

L1 - L2

210°

L1

L2 - N

240°

L1 

L2 - L3

270°

L1 (k<->l)

L3 - N

300°

L1 (k<->l)

L3 - L1

330°

k

K

k

K

l

L

l

L

Feed 1

Feed 2

K          L        K          L

Measurement via sum current converter

Current

measurement

Prophi-6R

k                               l

k                               l

Example:

C.converter 1: 1000/5A

C.converter 2: 1000/5A

Sum-current converter: 5A+5A/5A

C.converter ratio is: 2000/5A

Содержание Prophi 6R

Страница 1: ...lefonischer Support 49 6441 9642 22 E Mail info janitza com www janitza com www janitza com Power Factor Controller Prophi 6R Manual Version 6 0 E 11 2019 Power Factor Controller Prophi 6R Manual 1 2...

Страница 2: ...lization 9 5 2 Manual programming 10 5 3 Programming lock 12 Section 6 Manual operation Programming of fixed stages 13 Section 7 Service menu Test run 14 Section 8 Expert mode 15 8 1 Expert mode 1 8 2...

Страница 3: ...tion is available which will reduce the commissioning to a minimum Main features R 6 switching outputs 1 alarm relay R Twenty pre programmed control series with a self optimized intelligent control re...

Страница 4: ...firm and store values Increase selected parameter Reduce selected parameter 1 2 3 4 5 6 Power Factor Controller Blindleistungsregler Auto Program Manual Service Enter OK Prophi Blindleistungsregler Po...

Страница 5: ...e wired with copper leads of 2 2 5mm The connection should be set up as shown in Fig 3 The specified safety regulations must be observed The measuring voltage may lie in the range from 30 525 VAC and...

Страница 6: ...d current in the meas system is done in expert mode 1 page 17 Example Meas current L1 Meas Voltage L3 L2 Phase U I 90 6 L1 R L2 S L3 T N Meas current supply voltage Vb meas voltage L2 L3 k l T 2A T 2A...

Страница 7: ...t operation states are generated An individual adjustment resp suppression of particular messages is possible in expert mode 2 During suppression the indication of the message in the display a possibl...

Страница 8: ...VA ENTER 6 DIFF kVAR TO TARGET COS ENTER 7 FREQUENCY in Hz ENTER 8 TEMPERATURE in C F ENTER 9 HARMONICS 3 19 V I Selection via arrow keys ENTER 10 THD V THD I in ENTER 12 ENERGY in kWh kvarh reset in...

Страница 9: ...INIT and can be eliminated see possible error messages at the end of the manual AUTO INIT may be repeated then NOTE If the Prophi 6R has been put into operation successfully by AUTO INIT with all valu...

Страница 10: ...ontrol series required for the compensation network is again selected via the keys If the required control series should exceptionally not be present Annex 1 the user may define a special one control...

Страница 11: ...40 sec Selection is performed via the keys Continue with ENTER 11 DISCONNECTING TIME This refers to the time between disconnecting the capacitors to reduce the momentary network capacitance Setting r...

Страница 12: ...l harmonic distortion THD V is exceeded This value can be set under 27 Harmonics in 15 FAN TEMP 15 70 C Input of the switching threshold for the fan BASIC SETTING NO YES NO When the selection is made...

Страница 13: ...ay be permanently defined in succession continued switching via ENTER for the following statuses AUTO Automatic normal operation The relevant output is marked by a capacitor symbol FIXED The output is...

Страница 14: ...ER Back to 1 TEST RUN This menu point allows the user to check the settings of the PFC controller After activation of the test run the controller switches each stage on and off successively and calcul...

Страница 15: ...values of a measurement can be changed for special applications here 6 SWITCHING POWER max 100 kvar multiples of the smallest stage This factor specifies the maximum power which may be switched in on...

Страница 16: ...ified here see point 14 16 TEST ATTEMPTS 5 1 9 When at least this number of successive measurements has resulted in a fault in the capacitor power a C fault message is output 17 OUTPUT 1 STEP 0 255 0...

Страница 17: ...rror messages s above Example 3 ALARM DELAY TIME 10 min 1 255min Time after which the alarm relay will respond 4 UNDERVOLTAGE 50 20 100 meas voltage below this threshold will switch OFF all stages at...

Страница 18: ...nk Disadvantage This mode can only be used in control series with groups of the same stage power and long settling time as every switching step corresponds to the value of the smallest stage 3 Intelli...

Страница 19: ...ored The controller is then set to automatic operation with the operating mode key It is now ready for operation Section 12 Maintenance and warranty The controller should need no maintenance if the op...

Страница 20: ...ring voltage and current l and k Check phase position See above Current in measuring range Line interruption Wrong current converter factor Current transformer short circuited Check current converter...

Страница 21: ...AC 1000 W Programmable Illuminated graphic display 2 x 16 characters with convenient operating level 20 1 Sequential connection loop connection or self optimized switching response Four quadrant opera...

Страница 22: ...s if the required control series is not available for any reason The last control series Control Series E is selected by pressing the Programming key point 4 Control series and confirmed with ENTER Th...

Страница 23: ...rations warning Fast discharge Phase shift U I C Test C Fail Test Attempts Power 1 stage Control Default setting ENGLISH 1000 A 5 A 6 1 INTELLIGENT 25 00 kvar 0 98 IND 230 V L N NO 40 sec 40 sec 60 se...

Страница 24: ...Prophi 6R 24 24...

Страница 25: ...ME 60 s 13 ALARM TEMP 55 C 14 MESSAGE RELAY FAN 15 FAN TEMP 30 C 8 TEMPERATURE 25 0 C 9 HARMONICS 3 V 0 5 I 0 1 10 HARMONICS THD V 0 5 I 0 3 11 SYSTEM POWER 88 88 kvar 12 ENERGY 88 88 kWh SOFTWAREVERS...

Страница 26: ...SAT UNDERCOMPENSAT HARMONICS OVERTEMPERATURE OVERCURRENT UNDERVOLTAGE SWITCH OPERATIONs MEAS CURRENT C1 AUTO FIXED OFF C2 AUTO FIXED OFF C3 AUTO FIXED OFF C4 AUTO FIXED OFF C5 AUTO FIXED OFF C6 AUTO F...

Страница 27: ...Prophi 6R 27...

Страница 28: ...Janitza electronics GmbH Vor dem Polst ck 6 D 35633 Lahnau Tel 49 6441 9642 0 E Mail info janitza de info janitza de www janitza de...

Отзывы: