Installation Instructions Janfire Pellet Boiler Integral Typ 25
IA 32580002 EN_Ver5
Janfire 2014
23(25
)
Thermostat / time control connected
Chimney draft measured ( pa)
External combustion air inlet corresponds to
manufacturers & building control advice
Emission test other parameters changed?
# 23 calibrated?
Room free air vent size (L W )
Pellets stored properly and dry
Additional Boiler Inspection:
Flow & return pipes connected correctly
HT switch tested
Expansion vessel fitted to system (cap: ltr)
Heating system purged correctly
Buffer tank fitted to system (cap: ltr)
Heating system set to 1.5 to 2 bar
Return flow regulation is functioning
Heat is flowing after 20 min
Hearth to building control advice
Clearance from walls (L W ) related to
cleaning
Customer: (confirm of successful start up)
Service Technician:
Sign / Date:
Sign / Date:
8
Exploded views
8.1
Automatic ash outflow