background image

 

VENTING INFORMATION 

 

 
B.  For Canopy-type commercial cooking hoods the inside edge thereof shall 

overhang or extend a horizontal distance of not less than six (6) inches 
beyond the edge of the cooking surface on all open sides, and the vertical 
distance between the lip of the hood and the cooking surface shall not 

exceed four (4) feet. 

   

 

 

 

 

 

 

 

 

In all cases, it is imperative to obtain the approval of the AHJ (Authority Having 
Jurisdiction).  This will typically be the mechanical inspection department of the 
local municipality’s building inspection division and/or the local fire marshal. 

 

 
C.  A grease duct serving a Type 1 Hood shall be constructed of at least 0.05

4

 

inch thick (No. 16 Manufacturer’s Standard Gauge

)

 

s

teel or at least 

0.04

3

 inch thick stainless steel 

(No. 18 MSG). D

uct enclosures for grease 

duct shall be constructed as the Building Code requires.  Duct 

enclosures shall be of at least one-hour fire-resistive construction in 

 

all

 

buildings and shall be of

 

2-hour fire-resistive construction in 

buildings with four or more stories.

Notes :
 1. Exhaust volume should be determined by the exhaust hood 
manufacturer based on their products listing and local code 
requirements. States such as California, Oregon, Washington,  and 
Connecticut all have code driven maximum exhaust volumes for specific 
equipment.   For example:  California mandates that solid fuel exhaust 
hoods for a wall mounted application can use NO MORE than 385 cfm/lf 
for solid fuel.
 2.

Spark arrestor type filters are required

 3.

Hoods serving solid fuel equipment must be dedicated to solid fuel 

only (no gas or electric) with their own dedicated fire protection system. 
   

A.  

Exhaust  h

oods   should   be  

 
 

Liste

d,  Type  1  hoods with automatic fire 

       suppression systems and

 conform to NFPA 96  

 

requirements

.  

      

 

 

 

D.    

E

xhaust 

hood 

volume 

should be  based 

on the specifications from the 

                   

        2

009

 (or later)

 International Mechanical Code Section 507

.

               

 

Содержание Churrasco

Страница 1: ...SCO ROTISSERIE OPERATIONS AND SERVICE MANUAL J R MANUFACTURING INC 972 285 4855 Texas 820 W Kearney 800 527 4831 50 states Canada Suite B 972 289 0801 Parts and Service Mesquite Texas 75149 972 288 94...

Страница 2: ...SN _______________...

Страница 3: ...Open the doors only after it cools down Contact your supervisor if applicable while continuing to observe the pit If you observe any flames or perceive any fire threat immediately contact the local fi...

Страница 4: ......

Страница 5: ...OPERATIONS AND SERVICE MANUAL MANUFACTURED BY J R MANUFACTURING INC 820 B W Kearney St Mesquite Texas 75149 972 285 4855 Rev 09 17 CHURRASCO ROTISSERIES Solid Fuel...

Страница 6: ......

Страница 7: ...G PAGES 1 2 INSTALLATION INSTRUCTIONS PAGES 3 4 OPERATION PAGE 5 TROUBLESHOOTING PAGE 6 PREVENTIVE MAINTENANCE PAGE 7 PARTS LIST PAGE 8 CHURRASCO DRAWING BACK VIEW PAGE 11 CHURRASCO DRAWING SIDE VIEW...

Страница 8: ...called churrasco broilers actually have the Brazilian name Churrasqueira pronounced shoo raas kay da The foods served in the churrascarias are based around a variety of fire cooked meats with a true...

Страница 9: ...l as a tossed Caesar Salad mixed garden green salad spinach salads and Waldorf Salad Roasted red peppers huge finger size spears of white asparagus dressings of all kinds relishes a large selection of...

Страница 10: ...ce procedures to shut off the electrical supply At these times it is a good safety procedure to tag the switch to guard against someone inadvertently re energizing the circuit Your electrician should...

Страница 11: ...requires Duct enclosures shall be of at least one hour fire resistive construction in all buildings and shall be of 2 hour fire resistive construction in buildings with four or more stories Notes 1 Ex...

Страница 12: ...ess steel half moon resting spot To unload the spits the procedure is reversed END OF THE DAY CLEANUP At the end of the day the unit should be cleaned so as to remove all grease If grease is allowed t...

Страница 13: ...ck the chain connection between the motor sprocket and the sprocket on the lowest rotisserie shaft If the chain is broken then either repair the chain usually with a master link or replace the chain I...

Страница 14: ...with a Teflon additive and a cartridge type automotive grease gun Chain Lubricate the chains with a high temperature grease and check their tension The spit bolts revolve inside special high temperat...

Страница 15: ...Caster Misc Hardware 9571 Stover Lock Nut Misc Hardware 9572 Rotisserie Bolts Key 3 16 Sq Misc Hardware 9699 15 16 Combo Wrench Misc Hardware 9707 Churrasco Spit Bolt Misc Hardware 9780 30 RPM Rotisse...

Страница 16: ...1 40 15 Tooth Sprocket 0 Main Shafts Sprockets Gears 8724 QD Bushing JA 5 8 For Main Shaft Sprockets Gears 9422 40 24 Tooth Sprocket Motor Output Shaft Sprockets Gears 9719 Worm For Main Shaft 2 Sproc...

Страница 17: ...11...

Страница 18: ...12...

Страница 19: ...sible and to facilitate quick solutions to all problems that might arise with the lowest expense possible to the user s To help us achieve this goal please follow these procedures a problem Have ready...

Страница 20: ......

Отзывы: