SH
EE
T
1
O
F
1
D
W
G
N
O
O
yl
er
Un
der Hood
-
TI
TL
E
O
yl
er
Secti
on-Through V
iew
-
U
nd
er
H
oo
d
SI
ZE
B
SC
AL
E
J&
R
M
an
uf
ac
tu
rin
g,
I
nc
.
RE
V
Sc
ot
t
H
ig
gi
ns
3/
28
/2
01
7
D
RA
W
N
D
AT
E
M
ake
-up air
Filt
er Bank
Exhaust Hood D
esig
n P
ar
amet
ers f
or O
yler O
vens
1. 12 inch o
ver
hang a
t fr
on
t of unit
.
2. 6 inch o
ver
hang
, non-ac
tiv
e sides and r
ear (no fir
ebo
x).
3. 12 inch o
ver
hang on fir
ebo
x side (or r
ear
, f
or r
ear fir
ebo
x units).
4. F
ilt
er bank alw
ay
s o
ver chimney c
onnec
tor
.
5. Hood elev
ation: bott
om of hood t
o be a minimum of 2 inches
abo
ve t
op of o
ven( including base if an
y).
O
yler M
odel/ Hood Hood Exhaust
Fir
ebo
x L
oca
tion L
ength (in.)
W
idth (in.)
Volume (c
fm)
700 L
ef
t or R
igh
t 122 73.75 4300
700 R
ear 137
67.75
4000
1300 L
ef
t or R
igh
t
137 85.5 5000
1300 R
ear
152
79.5
4700
OUR REC
OMMEND
ATIONS
Typical O
yler
O
ve
n
Fr
on
t
O
ve
n
D
oors
Figur
e 5A
EXHA
UST HOOD DESIGN
A
lw
ay
s v
er
ify with hood and fir
e supr
ession v
endors and AHJ
1/16
27
Содержание 700E
Страница 2: ...SN _______________...
Страница 4: ......
Страница 6: ......
Страница 10: ...3...
Страница 30: ...23...
Страница 31: ...Figure 3 Oyler Through the Wall Installation with Direct Vent 24...
Страница 32: ...25...
Страница 33: ...Oyler With Exhaust Hood Vent Unit shown is a Model 700 Left Firebox Figure 5 26...
Страница 36: ...29...
Страница 38: ...31...
Страница 39: ...32...
Страница 40: ...33...
Страница 41: ...34...
Страница 42: ...35...
Страница 46: ...39...
Страница 47: ...40...
Страница 48: ...41...
Страница 49: ...42...
Страница 50: ...43...
Страница 55: ...48...
Страница 56: ...49...
Страница 60: ......