2. Move unit into position.
1.
Your unit will be shipped fully assembled. It can be handled with a
4000 pound capacity forklift.
Uncrate and inspect
for
concealed
shipping damage.
Install the casters (packed inside the unit).
INSTALLATION INSTRUCTIONS
Floor: Unit to be installed on a non-combustible floor
3. Vent
according to venting instructions on the following pages.
5. Electrical
The
unit
will require 2
2
0
Volt, 19 Amp, 50/60Hz
single-phase service
.
Directly wire the unit, making the field connections inside the junction
box provided.
Supply circuit requires
two
conductors plus
a
completely de-energize all components of the machine.
(PE)
ground (L1, L2,
PE
).
A two pole,
2
0-amp breaker is required. Turn the
circuit breaker off and tag it whenever servicing as this is the only way to
4. Clearances:
(in cm.) From Any Combustibles:
Above Top From Front From Back From Sides From Chimney
Of Casing Connector
30.5 122 15 2.5 46
Page 2 of 43
Содержание 250R-FS
Страница 2: ...SN _______________ ...
Страница 6: ......
Страница 8: ......
Страница 28: ...RE SET HERE RESETTING OVERLOADS Page 20 of 43 ...
Страница 30: ...Page 22 of 43 ...
Страница 31: ...37 39 38 FIREBOX DOOR 27 26 INTERIOR VIEW COWLING REMOVED 25B Page 23 of 43 ...
Страница 32: ...Page 24 of 43 ...
Страница 34: ...Page 26 of 43 ...
Страница 36: ...Page 28 of 43 ...
Страница 38: ...Page 30 of 43 ...
Страница 39: ...Page 31 of 43 ...
Страница 40: ...Page 32 of 43 ...
Страница 41: ...Page 33 of 43 ...
Страница 42: ...Page 34 of 43 ...
Страница 43: ... Page 35 of 43 ...
Страница 44: ... lJD Page 36 of 43 ...
Страница 45: ...Page 37 of 43 ...
Страница 46: ...Page 38 of 43 ...
Страница 47: ...Page 39 of 43 ...
Страница 48: ...Page 40 of 43 ...
Страница 52: ......