• Assemble
(2) SS
Eyebolts
and (2) SS
Serrated Flange Nuts
#10-24
from
Bag 9 (Misc. Hardware)
— With the flange facing up, thread (1)
Serrated Flange Nut
onto
each
Eyebolt
as far as it will go.
• Insert each eyebolt nut assembly up through the hole drilled in
Step 3
and secure with a
SS
Serrated Flange Nut
#10-24 from
Bag 9 (Misc.
Hardware)
, flange facing down.
• Using 3/8” wrench tighten each eyebolt assembly
NOTES:
- Turn the eyebolts so the opening of the loops are facing each other.
-
Where the eyebolts are installed is now considered the TOP of
the fan
.
4
Housing Side Panel Assembly:
• Start on a corner. With the front and back venturi section channels
inserted into the grooves of the housing side panel, slide the housing
panel across the top until it hits the center seam of the assembled
venturi sections.
• Lift up on the center of the housing side panel and continue to slide
housing side panel until it is centered.
• Repeat until all four sides have housing side panels installed
5
IS295-21C J&D Manufacturing • 6200 Hwy 12 • Eau Claire, WI 54701 • 1-800-998-2398 • www.jdmfg.com
Page 4/13
Location of eyebolts=
Top of Fan
Top of Fan