background image

Page: 07 of 09 

Columbia/ Mercer Island Series Cabinets: 389-V36-AGR-A  389-V36-CFO-A  389-V36-GW-A  389-V36-L TO-A 

Columbia Series Shelves:  388-SH36-AGR  388-SH36-CFO  388-SH36-GW  388-SH36-LTO 

Assembly/ Installation Instructions for both wall mounting (floating) and freestanding with metal base 

Columbia Series Metal Bases: 389-B36-GLD  389-B36-STD 

Materials 

for 

Installation: 

Drill 

Level 

Pencil 

Step 3b Notes: 

Place the vanity cabinet upside down 

on a blanket or other soft material, 

to prevent scratching. 

r-��

----

E

Step 4b Notes: 

Attach the metal bolts (

J

) to the bottom 

of the vanity cabinet.  Secure the bolts by 

turning the Allen Wrench (

E

Step 5b Notes: 

Remove the pre-attached metal mounting 

(French Cleat) brackets . 

I

E

= 1  pc  Allen Wrench (#4) 

= 6 pcs  Bolts 1/4" x 1  1/2" 

back of vanity cabinet 

JAMES  MARTIN  VANITIE今

Содержание Columbia 389-V36-AGR-A

Страница 1: ...Shelf For more convenient shipping the wood shelf used on the optional metal base is included with the cabinet If you are wall mounting your cabinet the shelf is an extra item and may be used for oth...

Страница 2: ...J Pencil We recommend the use of an electronic stud finder to locate the studs Alternately you may find studs by listening for a solid sound as you knock on the wall Special Note 1 If the studs in yo...

Страница 3: ...et 04 4Omm 8 1 pc Metal Bracket 27 1 2 700mm Drill C 7 pcs Drywall Anchors optional 08 38mm Step 4 Notes Pencil i i i i i Center line After you have located the wall studs position the metal bracket s...

Страница 4: ...wall mounting floating and freestanding with metal base Columbia Series Metal Bases 389 B36 GLD 389 B36 STD Materials for Installation Step 6 Notes Drill Attach the metal bracket B to the Wall using...

Страница 5: ...88 SH36 AGR 388 SH36 CFO 388 SH36 GW 388 SH36 LTO Assembly Installation Instructions for both wall mounting floating and freestanding with metal base Columbia Series Metal Bases 389 B36 GLD 389 B36 ST...

Страница 6: ...ve the best possible installation of this vanity cabinet James Martin Vanities always recommends you consult with a professional contractor Two people are required for the assembly and installation of...

Страница 7: ...ries Metal Bases 389 B36 GLD 389 B36 STD Materials for Installation Drill Level Pencil Step 3b Notes Place the vanity cabinet upside down on a blanket or other soft material to prevent scratching r rE...

Страница 8: ...6 GLD 389 B36 STD Materials for Installation Step 6b Notes Drill Place the cabinet against the wall mark the positions with a pencil through the pre drilled holes on the back rail Step 7b Notes Drill...

Страница 9: ...h wall mounting floating and freestanding with metal base Columbia Series Metal Bases 389 B36 GLD 389 B36 STD Materials for Installation Step Sb Notes Drill Secure the cabinet to the wall using hardwa...

Отзывы: