Page: 03 of 09
Columbia/ Mercer Island Series Cabinets: 389-V36-AGR-A 389-V36-CFO-A 389-V36-GW-A 389-V36-L TO-A
Columbia Series Shelves: 388-SH36-AGR 388-SH36-CFO 388-SH36-GW 388-SH36-LTO
Assembly/ Installation Instructions for both wall mounting (floating) and freestanding with metal base
Columbia Series Metal Bases: 389-B36-GLD 389-B36-STD
Materials
for
Installation:
A
=7 pcs Screws for Bracket 04*4Omm
8
=1 pc Metal Bracket (27 1/2" 700mm)
Drill
C
=7 pcs Drywall Anchors (optional) 08*38mm
Step 4 Notes:
Pencil
i
i
i
i
i
Center line
!
After you have located the wall studs, position the metal bracket so the holes align
with the center points of the studs. Mark these positions with a pencil.
Step 5 Notes:
Drill holes for the screws in the positions you have marked with the pencil.
Drill the holes' deepth no less than 1 1/2", insert hardware
C
(drywall anchors) to
the holes by using hammer if wall studs are not in the correct positions
-----f
I
I
I
I
I
I
Hammer
Version:202104
JAMES MARTIN VANITIE今